A mobile apparatus for trenching a pipeline laid under water includes a mobile base station such as a barge (1), a soil breaker (4) for breaking up soil adjacent to the pipeline, the soil breaker being connected to the mobile base station (1), one or more dredging units (5A to…
Fontolan Massimo
A method of joining two portions of an underwater pipeline laid on the bed of a body of water to conduct fluid and/or gas, the method including : joining a telescopic sleeve (39), having a first coupling head (40), to a first end (35) of a first pipeline portion (31) above the…
A method of laying underwater pipelines in the bed (3) of a body of water (2), the method including laying an underwater pipeline (4) along a given path (P) on the bed (3) of the body of water (2); breaking up a ground mass along the path (P) to a given depth in the bed (3); and…
A method of joining two portions of an underwater pipeline for conducting fluid and/or gas on the bed of a body of water, the method including the steps of: joining a telescopic sleeve, having a first coupling head, to a first end of a first pipeline portion above the body of…
An underwater hydrocarbon processing facility (1) has at least one fluid processing clusters (3a, 3b) provided with modules (4, 5, 6, 7) having, each, one fluid processing device and a plurality of first connection members (9) for defining the inlet and the outlet of the process…
A method of underground laying a continuous elongated member in a bed of a body of water, wherein the continuous elongated member lies on the bed of the body of water along a given path; the method including the steps of: fragmenting a soil mass in the bed along the given path…
A method of underground laying a continuous elongated member in a bed of a body of water, wherein the continuous elongated member lies on the bed of the body of water along a given path; the method including the steps of: fragmenting a soil mass in the bed along the given path…
A method of laying underwater pipelines in the bed of a body of water, the method including laying an underwater pipeline along a given path on the bed of the body of water; breaking up a ground mass along the path to a given depth in the bed; and fluidifying the broken ground…
An underwater hydrocarbon processing facility has at least one fluid processing clusters provided with modules having, each, one fluid processing device and a plurality of first connection members configured to define the inlet and the outlet of the process fluids; and an…
A mobile apparatus for trenching a pipeline laid under water includes a mobile base station such as a barge (1), a soil breaker (4) for breaking up soil adjacent to the pipeline, the soil breaker being connected to the mobile base station (1), one or more dredging units (5A to…
An underwater hydrocarbon processing facility (1) has at least one fluid processing clusters (3a, 3b) provided with modules (4, 5, 6, 7) having, each, one fluid processing device and a plurality of first connection members (9) for defining the inlet and the outlet of the process…
FIELD: construction. SUBSTANCE: group of inventions relates to construction of underwater pipelines. In the method of connection of two sections of the underwater pipeline a telescopic sleeve (39), having the first connection head (40), is connected with the first end (35) of…
An underwater hydrocarbon processing facility has at least one fluid processing clusters provided with modules having, each, one fluid processing device and a plurality of first connection members configured to define the inlet and the outlet of the process fluids; and an…
A method of temporarily supporting a soil mass susceptible to slide at a scarp slope bounding the soil mass includes advancing a supporting wall in an advancing direction along the scarp slope; and, in addition to the movement in the advancing direction, also moving a surface…
A self-propelled underwater vehicle for underground laying a continuous elongated member in a bed of a body of water having a work assembly, which is configured to be set, at least partly, into the bed, and is provided with two facing supporting walls for delimiting a space…
A method of laying underwater pipelines in the bed of a body of water, the method including laying an underwater pipeline along a given path on the bed of the body of water; breaking up a ground mass along the path to a given depth in the bed; and fluidifying the broken ground…
A method of temporarily supporting a soil mass susceptible to slide at a scarp slope bounding the soil mass includes advancing a supporting wall in an advancing direction along the scarp slope; and, in addition to the movement in the advancing direction, also moving a surface…
A method of laying underwater pipelines in the bed (3) of a body of water (2), the method including laying an underwater pipeline (4) along a given path (P) on the bed (3) of the body of water (2); breaking up a ground mass along the path (P) to a given depth in the bed (3); and…
An underwater hydrocarbon processing facility (1) has at least one fluid processing clusters (3a, 3b) provided with modules (4, 5, 6, 7) having, each, one fluid processing device and a plurality of first connection members (9) for defining the inlet and the outlet of the process…
A method of joining two portions of an underwater pipeline laid on the bed of a body of water to conduct fluid and/or gas, the method including: joining a telescopic sleeve, having a first coupling head, to a first end of a first pipeline portion above the body of water; laying…
A method of joining two portions of an underwater pipeline for conducting fluid and/or gas on the bed of a body of water, the method including the steps of: joining a telescopic sleeve, having a first coupling head, to a first end of a first pipeline portion above the body of…