US 6,006,196 A#67982 Most Cited · 179 citations6.6/yr · PR 37.87ExpiredUS · Utility
Method of estimating future replenishment requirements and inventory levels in physical distribution networks
Inventors: Feigin Gerald E, Katircioglu Kaan Kudsi, Yao David Da-weiAssignee: IbmFiled 1997-05-01 · Granted 1999-12-21

A method suitable for use in a physical distribution network. The method comprises the steps of using a distribution resource planning (DRP) logic for providing estimates of at least one of projected future on-hand inventory and replenishment requirements; and, incorporating…

US 5,946,212 A#724100 Most Cited · 57 citations2.1/yr · PR 13.25ExpiredUS · Utility
Method of allocating work in capacity planning
Inventors: Bermon Stuart, Feigin Gerald EAssignee: IbmFiled 1997-07-28 · Granted 1999-08-31

A computer implemented method provides accurate capacity planning for manufacturing environments comprising parallel, unrelated tools that can process the same operations at different rates and with preferences for the sequence in which those tools are selected to accommodate…

US 6,341,240 B1#864996 Most Cited · 52 citations2.2/yr · PR 8.89ExpiredUS · Utility
Method of allocating work in capacity planning
Inventors: Bermon Stuart, Feigin Gerald EAssignee: IbmFiled 1999-06-04 · Granted 2002-01-22

A computer implemented method provides accurate capacity planning for manufacturing environments comprising parallel, unrelated tools that can process the same operations at different rates and with preferences for the sequence in which those tools are selected to accommodate…

TW 357,310 B#60879813 Most Cited · 1 citations0.0/yr · PR 0.76ExpiredTW · Utility
Method for estimating future replenishment requirements and inventory levels in physical distribution networks
Inventors: Feigin Gerald E, Katircioglu Kaan Kudsi, Yao David Da-weiAssignee: IbmFiled 1997-12-17 · Granted 1999-05-01

A method for estimating future replenishment requirements and inventory levels in physical distribution networks, including the following steps: (1) provision, by means of DRP logic, of either future replenishment requirement or inventory levels; and (2) incorporating within the…