The present invention discloses firmware downloading preprocess method based on OTA technology, firmware integrality verification method and firmware downloading method. In mentioned firmware downloading method, executing predefined process for downloading firmware to generate…
Fading Yao
The invention discloses a wireless data card. The wireless data card comprises an interface module which is used for connecting the wireless data card to a terminal by a USB interface or an SDIO interface, an identification module which is connected to the interface module and…
In order to solve the problem of lower application efficiency of the prior EEPROM storage space, the invention discloses equipment and data storage and startup methods thereof. The data storage method comprises the following steps: acquiring data to be stored in an…
The invention discloses a remote control method for a mobile terminal, which comprises the following processing that: a radio base station reports the location information of the mobile terminal at a real time; a server judges the area where the mobile terminal is in changes…
The invention provides an LTE (Long Term Evolution) data business throughput rate counting method and network equipment. The method comprises the following steps of: carrying out a degressive operation on the total data volume, to be transmitted within unit time, of a data…
The present invention discloses a protective device for preventing the short circuit of a power supply. The present invention comprises a comparing control circuit (11) and a switching control circuit (12), wherein in the switching control circuit (12), the input end of a…
A kind of method that the time slot convergence equipment is carried out remote online upgrading, the hardware system that relates to the time slot convergence equipment in strange land carries out the online upgrading technology.Scheme is: main journey district and secondary…
The testing method includes (1) single board power on; (2) testing one timing route output; if testing result is error, then ending test after outputting error tested result; (3) if testing is correct; then testing whether there is output timing signal of another route; if…