One embodiment is directed to a multi-rack rack controller for an automated infrastructure management (AIM) system comprising a plurality of independent patching equipment bus interfaces. Another embodiment is directed to a rack controller comprising at least one rack controller…
Eastham Thomas
In one embodiment, a system for providing port occupancy management for a network connected device that includes a plurality of ports comprises: at least one port status input panel that comprises a plurality of manually operable port occupancy status selector switches, wherein…
One embodiment is directed to a multi-rack rack controller for an automated infrastructure management (AIM) system comprising a plurality of independent patching equipment bus interfaces. Another embodiment is directed to a rack controller comprising at least one rack controller…
One embodiment is directed to a multi-chassis controller for an Automated Infrastructure Management (AIM) system including a plurality of independent patch equipment bus interfaces. Another embodiment is directed to a rack controller that includes at least one rack controller…
A rack controller with local support for intelligent patching equipment installed in multiple racks is disclosed. One embodiment is directed to a multi-chassis controller for an Automated Infrastructure Management (AIM) system including a plurality of independent patch equipment…
In one embodiment, a system for providing port occupancy management for a networked device including a plurality of ports comprises: at least one port status input panel comprising a plurality of manually operable port occupancy status selector switches, wherein each of the…
One embodiment is directed to a multi-rack rack controller for an automated infrastructure management (AIM) system comprising a plurality of independent patching equipment bus interfaces. Another embodiment is directed to a rack controller comprising at least one rack controller…
In one embodiment, a system for providing port occupancy management for a network connected device that includes a plurality of ports comprises: at least one port status input panel that comprises a plurality of manually operable port occupancy status selector switches, wherein…
19,752. Eastham, T. H. Aug. 27. Carding-engines.-The wire of the rollers is supported by end collars a provided with ears or projections c, which grip the roller b or are secured to it by screws &c.
27,749. Eastham, T., and Hull, A. Dec. 16. Doors, locking automatically and simultaneously. -A bolt b, provided with a head d, is guided in a bush c, secured in the carriage frame above each door, or in a casing g fixed to the frame, and is adapted to engage a socket let into…
One embodiment is directed to a multi-rack rack controller for an automated infrastructure management (AIM) system comprising a plurality of independent patching equipment bus interfaces. Another embodiment is directed to a rack controller comprising at least one rack controller…
In one embodiment, a system for providing port occupancy management for a network connected device that includes a plurality of ports comprises: at least one port status input panel that comprises a plurality of manually operable port occupancy status selector switches, wherein…
One embodiment is directed to a system comprising a portable device executing a mobile application; and a rack controller without a display unit, the rack controller comprising a base unit. The base unit includes a processor configured to execute software that directs the…
One embodiment is directed to a system comprising a portable device executing a mobile application; and a rack controller without a display unit, the rack controller comprising a base unit. The base unit includes a processor configured to execute software that directs the…
In one embodiment, a system for providing port occupancy management for a network connected device that includes a plurality of ports comprises: at least one port status input panel that comprises a plurality of manually operable port occupancy status selector switches, wherein…
In one embodiment, a system for providing port occupancy management for a network connected device that includes a plurality of ports comprises: at least one port status input panel that comprises a plurality of manually operable port occupancy status selector switches, wherein…
One embodiment is directed to a multi-rack rack controller for an automated infrastructure management (AIM) system comprising a plurality of independent patching equipment bus interfaces. Another embodiment is directed to a rack controller comprising at least one rack controller…
An intelligent consolidated enclosure system is provided that includes a plurality of spaced edge convergence points positioned within a building. Each edge convergence point is located in an associated unique location within the building to provide services to the unique…