The soil-rock mixture Tunnel Design method based on digital picture and big data that the present invention relates to a kind of, belongs to field of civil engineering.Step are as follows: S1: section geological condition obtains: S2: excavating information integral model:…
Du Libing
The present invention relates to a kind of multifactor three-dimensional soil-rock mixture generation methods, belong to configuration simulation and numerical arts.The method comprising the steps of: S1: soil-rock mixture acquisition of information;S2: the building of block…
The present invention relates to based on the oval multifactor two-dimentional soil-rock mixture generation method stacked with random field, belong to configuration simulation and numerical arts.This method are as follows: S1: soil-rock mixture generates acquisition of…
The invention provides a construction method of an ultra-long distance hard rock jacking pipe, which comprises the following steps: firstly, excavating a working well and installing pipe jacking construction equipment, then starting the pipe jacking machine, installing a first…
The block discrete element analysis generation method based on progressive finite element grid and Voronoi split plot designs that the present invention relates to a kind of, belongs to numerical arts.The method comprising the steps of:S1:Modeling information is drawn using…
The invention provides a long-distance rock jacking pipe frictional resistance calculation method and a pipe rock contact state detection method. And determining the unit length frictional resistance threshold range of the corresponding pipe joints under different pipe rock…
The invention provides a concrete dam deformation prediction method, computer equipment and a storage medium. Meanwhile, a double-attention mechanism method based on factor attention and time memory attention is adopted, and weights of different factors and time can be…
The invention discloses a kind of large-scale many specimen test devices of MTS CYCLIC LOADINGs single and discreteness discrimination method, belong to field of experiment equipment, be included in the base away from the fixed installation of MTS loading heads distance…
The invention discloses a kind of nitrogen-filled seals of volatility oil storage tank and refrigeration-type gas recovery system for oil, including oil tank, oil tank is respectively arranged on the left side and the right side oil filler and unloading port, oxygen sensor is…
The invention discloses a kind of tomography digital imaging devices of indoor soil-rock mixture sample and three-dimensional numerical value Reverse reconstruction method, belong to testing equipment field, the device includes:Fixed mechanism, workpiece polishing mechanism,…
The invention relates to a slope vibration table model test device and method considering the degradation of a hydro-fluctuation belt rock mass, and belongs to the field of geotechnical engineering. The device includes mold box system, water circulating system and survey…
The utility model discloses a kind of field cable feeder pillar, it comprises casing and chamber door, described casing is provided with heat abstractor on chamber door both sides box wall, described heat abstractor comprises blade, described blade and tank wall are rotationally…
The invention discloses a device and a method for preparing a triaxial sample of a soil-rock mixture. Firstly, rapidly preparing uniform granular matrix soil meeting the target water content through a soil crushing mesh screen; secondly, loading the sample by a combined sample…
The utility model discloses an intelligent fuse disconnecting switch, comprising a disconnecting switch body and a fuse, and also comprises a mobile communication network, a mobile communication hosting server, an alarm system, and an on-site function unit. Two ends of the fuse…
The present invention relates to a kind of soil-rock mixture tunnel three-dimensional digital information management system construction methods, belong to field of civil engineering.Step are as follows: S1: information input: construction personnel inputs the photo of section,…
The invention relates to a method for manufacturing crude polypropylene-basalt hybrid fiber prefabricated hard fiber concrete and jacking pipes, which comprises the following steps: the concrete contains basalt fibers and coarse polypropylene fibers, wherein the mass ratio of…
The invention relates to a method for manufacturing an arbitrary closed dissolving cavity based on a soluble cavity salt block, which belongs to the field of rock and soil tests and comprises the following steps: s1: manufacturing a soluble cavity salt block mold; s2: the…
The utility model discloses a kind of heat radiation cable branch box, it comprises casing and chamber door, casing is provided with heat abstractor on chamber door both sides box wall, heat abstractor comprises blade and support portion, support portion is fixed on above blade,…
nullA kind of quality purifying device for water of polluted-water,Including framework,The floating frame being connected with framework,Framework has N number of and interconnects successively,Framework is made up of hypoxia response pond and oxygen-enriched filtering…
The invention discloses a water saturation prediction method based on an antagonistic neural network, which comprises the following steps: s1: obtaining underground medium parameters by an AVO three-parameter inversion method; s2: approximating the subsurface medium parameters…
The utility model discloses an elastic adjusting bolt. The elastic adjusting bolt comprises a screw rod with a cap, a lifting pin, a sleeve and a compression spring, wherein one end of the sleeve is closed, and the other end of the sleeve is open; the screw rod is connected with…
The utility model discloses a kind of anti-theft isolated switch, turning handle is provided with chute, in chute, slippage is connected with locking plate, turning handle is provided with lockhole, locking plate to be provided with in slipping can with the through hole of…
The present invention relates to the artificial Preparation Methods made of stones based on multiple dimensioned three-dimensional, belong to During Geotechnical Tests field.The method comprising the steps of: S1: the selection of block stone template;S2: flexible die…
The invention provides an intelligent system data supervision method based on a private chain; the method comprises the following steps: generating blocks for the data in real time based on a Cuckoo Cycle algorithm and storing the blocks into a private chain; the operation and…
The invention relates to the technical field of reservoir dam health monitoring, in particular to a dam seepage flow prediction method and device based on deep forests. The dam seepage characteristic data are used for representing the time lag influence of external factors on…