In a method for producing liquid pig iron or liquid steel pre-products from charging substances comprising iron ore, preferably in lumps or pellets, and optionally fluxes. The charging substances are directly reduced to sponge iron in a reduction zone ( 12 ) and the sponge iron…
Diehl Joerg
A process for producing liquid pig iron or liquid steel preproducts and sponge iron from iron ore. The iron ore in a first reduction zone (4) is directly reduced to sponge iron. The sponge iron in a meltdown gasifying zone (10) is melted under the supply of carbon carriers and…
The invention relates to a process for the reduction of metal-oxide-bearing material, particularly of iron ore, in a reduction vessel ( 1 ), wherein the metal-oxide-bearing material is charged from a vessel ( 2 ) for the metal-oxide-bearing material into the reduction vessel ( 1…
FIELD: metallurgy. SUBSTANCE: method of production of iron melt, or melt of steel semiproducts and sponge iron from charged materials including iron ore, preferably of lumpy and/or granulated iron ore, and, if necessary, fluxes, includes direct reduction of charged materials…
PCT No. PCT/AT95/00232 Sec. 371 Date May 30, 1997 Sec. 102(e) Date May 30, 1997 PCT Filed Nov. 28, 1995 PCT Pub. No. WO96/17089 PCT Pub. Date Jun. 6, 1996In a process for producing sponge iron from particulate iron oxide-containing material, the iron oxide-containing material in…
In a process for producing liquid raw iron or liquid steel base products and iron sponge from iron ore, the latter is directly reduced to iron sponge in a first reduction region (4), said iron sponge is melted in a melt-down gasification region (10) with the addition of carbon…
The invention relates to a plant for the production of spongy metal, in particular spongy iron, from materials made of metal ore, in particular iron ore, preferably in the form of lumps and/or pellets, and optionally, fillers. Said plant has at least a first gas source (1, 3)…
The invention relates to a method of manufacturing melted pig iron or steel product and sponge iron by iron ore and combustion-supporting agent, the material is directly reduced to the sponge iron in the reduction area 12 of the fixed bed, the sponge iron is melted in melting…
The invention relates to a method for producing liquid pig iron or liquid steel pre-products from a charge consisting of iron ore, preferably in the form of lumps and/or pellets, and optionally fillers. In the above process, the charge material used is directly reduced to sponge…
In a process for the production of molten pig iron or molten steel pre-products and sponge iron from charging materials consisting of iron ore and, if desired, fluxes, direct reduction of the charging materials to sponge iron is carried out in a fixed-bed reduction zone, the…
The invention relates to a plant for the production of spongy metal, in particular spongy iron, from materials made of metal ore, in particular iron ore, preferably in the form of lumps and/or pellets, and optionally, fillers. Said plant has at least a first gas source (1, 3)…
The adaptor (10) has two interconnectable components (O,U) of which at least one has a frame or ring form. The component or components have a frame or ring end (13,23) which align with one another in the assembled lockable position. The ring or frame ends of the components…
Two detachable upper and lower C-shaped plastic segments are connected in interlocking manner to one another. Lower segment (U) is attached to a fuel tank annular lid (D). An upper segment is attached on the base of the implement kit or fuel tank bag. The lower segment receives…
In a process for producing sponge iron from particulate iron oxide-containing material, iron oxide-containing material is reduced to sponge iron with a reducing gas in a reduction zone (4) and gas produced during reduction is withdrawn as top gas. In order to effectively use top…
The invention relates to a process for the production of liquid pig iron or liquid intermediate products of steel from materials made from iron ore, preferably in the form of lumps and/or pellets, and optionally, fillers. During said process the materials used are directly…
PCT No. PCT/AT95/00232 Sec. 371 Date May 30, 1997 Sec. 102(e) Date May 30, 1997 PCT Filed Nov. 28, 1995 PCT Pub. No. WO96/17089 PCT Pub. Date Jun. 6, 1996In a process for producing sponge iron from particulate iron oxide-containing material, the iron oxide-containing material in…
A plant for producing sponge metal, in particular sponge iron, from charging materials consisting of metal ore or iron ore respectively, preferably in lumps and/or pellets, and optionally fluxes, comprising at least one first gas source ( 1, 3 ) dispensing a CO— and H 2 -…
Bei einem Verfahren zum Herstellen von flüssigem Roheisen oder flüssigen Stahlvorprodukten aus von Eisenerz, vorzugsweise in Stück- und/oder Pelletform, und gegebenenfalls Zuschlägen gebildeten Einsatzstoffen werden die Einsatzstoffe in einer Reduktionszone (12) zu Eisenschwamm…
Used reduction gas from the reduction vessel (1) is burned and used to operate a gas block (16) between the reduction vessel and a vessel (2) with materials containing metal oxides. As a result, the reduction vessel is blocked against the vessel (2). The used reduction gas is…
The two basic sidepieces (3) have large apertures and are of a modified triangular shape with a straight base and a straight top edge blending into a large radius curved portion. Straps or metal portions (4) extend toward each other from the two sidepieces and have quick-acting…
In a process for producing sponge iron from particulate iron oxide-containing material, iron oxide-containing material is reduced to sponge iron with a reducing gas in a reduction zone (4) and gas produced during reduction is withdrawn as top gas. In order to effectively use top…
PCT No. PCT/AT95/00198 Sec. 371 Date Jul. 22, 1997 Sec. 102(e) Date Jul. 22, 1997 PCT Filed Oct. 12, 1995 PCT Pub. No. WO96/12044 PCT Pub. Date Apr. 25, 1996In a process for the production of molten pig iron or molten steel pre-products and sponge iron from charging materials…
PCT No. PCT/AT95/00232 Sec. 371 Date May 30, 1997 Sec. 102(e) Date May 30, 1997 PCT Filed Nov. 28, 1995 PCT Pub. No. WO96/17089 PCT Pub. Date Jun. 6, 1996In a process for producing sponge iron from particulate iron oxide-containing material, the iron oxide-containing material in…