The invention provides a tunnel construction method for crossing a high-pressure water-enriched fracture zone with curtain grouting and grout stopping wall, belonging to the field of building construction. The method comprising the following steps of: after cleaning a tunnel…
Cunlan Wei
The invention discloses an existing line transverse lifting strengthening method and an existing line transverse lifting strengthening structure. Different from the conventional line straightening method requiring bed timber replacing and track locking, the method adopts a…
The utility model relates to a windblown sand flow measuring device, and in particular relates to a windblown sand collector. The windblown sand collector comprises a rotating device and a collecting barrel as well as an upright, wherein the rotating device and the collecting…
The utility model discloses a cutting device of a wiring insulated sleeve of the electrical appliance for cutting the wiring insulated sleeve of the electrical appliance, which consists of a stand, a fixed blade, a cutter, a feed supporting board, a length adjuster and a lower…
The utility model discloses a structure for horizontally lifting and reinforcing existing lines, which improves the former method that a sleeper and a track-locking need to be replaced in line reinforcement. The utility model adopts the construction technology that an III-shaped…
The utility model relates to an engineering protection structure, in particular to a roadbed wind-sand-proof facility capable of automatically adjusting a wind-sand-resisting direction in a gobi gale region, comprising a plurality of spans of wind-sand-proof devices which are…