Patents
Inventor / Author Profile

Bramberger Robert

188Total Forward Citations
117Indexed Patents
9Patent H-Index
US 2019094834 A1#3232923 Most Cited · 24 citations3.4/yr · PR 3.73PendingUS · Application
Method and Device for Planning and/or Controlling and/or Simulating the Operation of a Construction Machine
Inventors: Bramberger RobertAssignee: Liebherr Werk Biberach GmbhFiled 2017-04-06

A method and a device for planning and/or controlling and/or simulating the operation of a construction machine, in particular in the form of a crane, using a structure data model which contains digital information on a structure to be erected and/or to be worked on. A…

US 2020180763 A1#6469188 Most Cited · 15 citations2.5/yr · PR 2.04PendingUS · Application
Method and device for lifting a load

The present invention relates to a method and a device for lifting a load, wherein at least one aerial drone carries at least a portion of the load. In order to lift a load, it is proposed to yoke together a plurality of aerial drones or at least one aerial drone and a lifting…

US 2022032500 A1#7049430 Most Cited · 14 citations3.5/yr · PR 2.14PendingUS · Application
Construction and/or materials-handling machine and method for guiding and moving a working head
Inventors: Bramberger Robert, KÖgl MartinAssignee: Liebherr Werk Biberach GmbhFiled 2021-10-05

The invention relates to a method and a construction and/or a materials-handling machine for guiding and moving a working head, in particular a 3D print head, wherein at least three revolving tower cranes are attached to each other with their booms, wherein according to one…

US 2021054601 A1#8603498 Most Cited · 12 citations2.4/yr · PR 1.92PendingUS · Application
Method and device for maintaining and/or repairing a construction machine
Inventors: Bramberger Robert, KÖgl MartinAssignee: Bramberger Robert, Koegl MartinFiled 2020-11-04

The invention relates to a device for maintaining and/or repairing a construction machine, with a mobile maintenance station that can be placed at the jobsite where the construction machine is being used, comprising a 3D printer for printing replacement parts for the…

WO 2017/174195 A1#8097169 Most Cited · 12 citations1.3/yr · PR 3.19PendingWO · Application
Method and device for planning and/or controlling and/or simulating the operation of a construction machine
Inventors: Bramberger RobertAssignee: Liebherr Werk Biberach GmbhFiled 2017-04-06

The invention relates to a method and a device for planning and/or controlling and/or simulating the operation of a construction machine, in particular in the form of a crane, using a structure data model which contains digital information on a structure to be erected and/or to…

DE 102016004382 A1#8797218 Most Cited · 11 citations1.2/yr · PR 4.83PendingDE · Application
Verfahren und Vorrichtung zum Planen und/oder Steuern und/oder Simulieren des Betriebs einer Baumaschine
Inventors: Bramberger RobertAssignee: Liebherr Werk Biberach GmbhFiled 2016-04-08

Die vorliegende Erfindung betrifft ein Verfahren sowie eine Vorrichtung zum Planen und/oder Steuern und/oder Simulieren des Betriebs einer Baumaschine, insbesondere in Form eines Krans, unter Verwendung eines Bauwerkdatenmodells, das digitale Informationen über ein zu…

US 2019152051 A1#10633797 Most Cited · 10 citations1.4/yr · PR 1.88PendingUS · Application
Device, a system and a method for building stationary structures on a working surface
Inventors: Bramberger RobertAssignee: Liebherr Werk Biberach GmbhFiled 2017-04-07

An example device for building stationary structures on a work surface includes a scaffold, which is arranged around the work surface. In the example, a working head is provided, which, with the help of multiple control cables is held on the scaffold and arranged above the work…

US 2021347614 A1#10500068 Most Cited · 10 citations2.0/yr · PR 2.03PendingUS · Application
Cable robot
Inventors: Bramberger RobertAssignee: Bramberger RobertFiled 2021-07-22

The invention relates to a cable robot for creating a structure or manipulating a workpiece, comprising a working head which is suspended on a support structure having at least three support columns by a system of cables having at least three control cables, wherein cable…

WO 2017/174201 A1#11932232 Most Cited · 9 citations1.0/yr · PR 1.84PendingWO · Application
Device, a system and a method for building stationary structures on a working surface
Inventors: Bramberger RobertAssignee: Liebherr Werk Biberach GmbhFiled 2017-04-07

The invention relates to a device (1) for building stationary structures on a working surface (1), wherein the device (1) comprises a framework (2) which is arranged around the working surface (4), wherein a working head (3) is provided which is held on the framework (2) by…

CN 109,074,536 A#14565414 Most Cited · 7 citations0.9/yr · PR 2.23ActiveCN · Utility
The method and apparatus of plan and/or control and/or the operation of construction simulation machinery
Inventors: Bramberger RobertAssignee: Liebherr Werk Biberach GmbhFiled 2017-04-06

The present invention relates to the method and device of a kind of plan and/or control and/or the operation of construction simulation machinery, particularly the construction machinery of crane form, use includes the structured data model of the digital information of the…

WO 2020/201400 A1#14945660 Most Cited · 7 citations1.2/yr · PR 1.92PendingWO · Application
Building and/or material handling machine and method for guiding and moving a working head
Inventors: Bramberger Robert, KÖgl MartinAssignee: Liebherr Werk Biberach GmbhFiled 2020-04-02

The invention relates to a method and to a building and/or material handling machine for guiding and moving a working head, in particular a 3D printing head, wherein at least three revolving tower cranes are fastened to one another by way of the booms thereof, wherein, according…

US 2020319363 A1#18635237 Most Cited · 6 citations1.0/yr · PR 1.35PendingUS · Application
Device For Controlling, Monitoring And Visualizing Construction Sites
Inventors: Bramberger Robert, KÖgl MartinAssignee: Liebherr Werk Biberach GmbhFiled 2018-10-08

A system for controlling and/or monitoring and/or visualizing construction sites, including a detection device for detecting the position of a construction unit at the construction site, wherein the detection device includes a signal transmitter to be mounted on the construction…

CN 109,072,621 A#21933639 Most Cited · 5 citations0.6/yr · PR 1.29ActiveCN · Utility
For constructing the devices, systems, and methods of stationary structure on working face
Inventors: Bramberger RobertAssignee: Liebherr Werk Biberach GmbhFiled 2017-04-07

The present invention relates to a kind of devices (1) for the building stationary structure on working face (4), and wherein device (1) includes scaffold (2), is arranged in around working face (4);Wherein equipped with work head (3), it is retained on scaffold (2) and is…

CN 110,914,152 A#20156632 Most Cited · 5 citations0.8/yr · PR 1.66ActiveCN · Utility
Method and device for lifting load

The invention relates to a method and an arrangement for lifting a load (20), wherein at least one drone (9) carries at least a part of the load. According to the invention, in order to lift a load, it is proposed to connect together a plurality of drones (9, 9b) or at least one…

CN 111,183,440 A#21275001 Most Cited · 5 citations0.8/yr · PR 1.41ActiveCN · Utility
Device for controlling, monitoring and visualizing construction site
Inventors: Bramberger Robert, Kogl MartinAssignee: Liebherr Werk Biberach GmbhFiled 2018-10-08

The invention relates to a device for controlling and/or monitoring and/or visualizing a construction site, comprising a detection device for detecting the position of a construction component on the construction site, wherein the detection device comprises a signal generator…

WO 2019/211393 A1#20952931 Most Cited · 5 citations0.7/yr · PR 1.47PendingWO · Application
Method and device for maintaining and/or repairing a construction machine
Inventors: Bramberger Robert, KÖgl MartinAssignee: Liebherr Werk Biberach GmbhFiled 2019-05-02

The invention relates to a device for maintaining and/or repairing a construction machine, with a mobile maintenance station that can be placed at the site where the construction machine is being used, comprising a 3D printer for printing replacement parts for the construction…

DE 102019101623 A1#26696726 Most Cited · 4 citations0.7/yr · PR 1.17PendingDE · Application
Seilroboter
Inventors: Bramberger RobertAssignee: Liebherr Werk Biberach GmbhFiled 2019-01-23

Die Erfindung betrifft einen Seilroboter zur Erstellung eines Bauwerks oder Manipulation eines Werkstücks, mit einem Arbeitskopf, der durch eine Verseilung umfassend zumindest drei Steuerseile an einer Tragstruktur umfassend zumindest drei Tragsäulen aufgehängt ist, wobei…

DE 102019109019 A1#25788674 Most Cited · 4 citations0.7/yr · PR 1.27PendingDE · Application
Bau- und/oder Materialumschlagsmaschine sowie Verfahren zum Führen und Bewegen eines Arbeitskopfs
Inventors: Bramberger Robert, KÖgl MartinAssignee: Liebherr Werk Biberach GmbhFiled 2019-04-05

Die Erfindung betrifft ein Verfahren sowie eine Bau- bzw. Materialumschlagsmaschine zum Führen und Bewegen eines Arbeitskopfs, insbesondere eines 3D-Druckkopfs, wobei zumindest drei Turmdrehkrane mit ihren Auslegern aneinander befestigt werden, wobei nach einem Aspekt der…

US 10,921,771 B2#27315365 Most Cited · 4 citations0.8/yr · PR 1.04ActiveUS · Utility
Method and device for planning and/or controlling and/or simulating the operation of a construction machine
Inventors: Bramberger RobertAssignee: Liebherr Werk Biberach GmbhFiled 2017-04-06 · Granted 2021-02-16

A method and a device for planning and/or controlling and/or simulating the operation of a construction machine, in particular in the form of a crane, using a structure data model which contains digital information on a structure to be erected and/or to be worked on. A…

US 2021223753 A1#26920148 Most Cited · 4 citations0.8/yr · PR 1.14PendingUS · Application
Method and Device for Planning and/or Controlling and/or Simulating the Operation of a Construction Machine
Inventors: Bramberger RobertAssignee: Liebherr Werk Biberach GmbhFiled 2021-01-25

A method and a device for planning and/or controlling and/or simulating the operation of a construction machine, in particular in the form of a crane, using a structure data model which contains digital information on a structure to be erected and/or to be worked on. A…

WO 2018/224657 A1#26535146 Most Cited · 4 citations0.5/yr · PR 1.19PendingWO · Application
Method and device for lifting a load

The present invention relates to a method and a device for lifting a load (20), wherein at least one drone (9) carries at least some of the load. According to the invention, multiple drones (9, 9b) are connected to each other or at least one drone is connected to a load hook (8)…

DE 102017126389 A1#32349389 Most Cited · 3 citations0.4/yr · PR 1.10PendingDE · Application
Verfahren und Vorrichtung zum Bereitstellen einer Werkstückdarstellung an einem Fertigungsplatz
Inventors: Bramberger RobertAssignee: Liebherr Werk Biberach GmbhFiled 2017-11-10

Die vorliegende Erfindung betrifft ein Verfahren sowie eine Vorrichtung zum Bereitstellen einer Werkstückdarstellung an einem Fertigungsplatz, wobei in zumindest einer Datenbank ein Datensatz zum Bereitstellen eines Originalmodells des Werkstücks gespeichert wird und auf einer…

US 12,209,422 B2#33710249 Most Cited · 3 citations3.0/yr · PR 1.01ActiveUS · Utility
Construction and/or materials-handling machine and method for guiding and moving a working head
Inventors: Bramberger Robert, KÖgl MartinAssignee: Liebherr Werk Biberach GmbhFiled 2021-10-05 · Granted 2025-01-28

The invention relates to a method and a construction and/or a materials-handling machine for guiding and moving a working head, in particular a 3D print head, wherein at least three revolving tower cranes are attached to each other with their booms, wherein according to one…

US 2021363728 A1#33477933 Most Cited · 3 citations0.6/yr · PR 1.03PendingUS · Application
Device and method for controlling and/or configuring a construction machine
Inventors: Bramberger Robert, KÖgl MartinAssignee: Bramberger Robert, Koegl MartinFiled 2021-08-09

The invention relates to a device for controlling and/or configuring construction machines, whose electronic control device can be reconfigured and/or extended by installing a program packet, comprising a central server for providing and/or downloading different program packets,…

CN 111,602,167 A#37232375 Most Cited · 2 citations0.3/yr · PR 1.12ActiveCN · Utility
Method and apparatus for providing a representation of a workpiece at a manufacturing station
Inventors: Bramberger RobertAssignee: Liebherr Werk Biberach GmbhFiled 2018-11-08

The invention relates to a method and a device for providing a representation of a workpiece at a manufacturing station, wherein a data set for providing an original model of the workpiece is stored in at least one database and the stored model data is used to display the…