Patents
Inventor / Author Profile

Bodas Devadatta V Deva

53Total Forward Citations
9Indexed Patents
3Patent H-Index
US 2016054780 A1#2187491 Most Cited · 31 citations3.1/yr · PR 3.29PendingUS · Application
Power aware job scheduler and manager for a data processing system

An indication of a mode for a job is received. An available power for the job is determined based on the mode. A first power for the job is allocated based on the available power. A first frequency for the job is determined based on the available power. The first power is…

US 2016054774 A1#8405491 Most Cited · 12 citations1.2/yr · PR 2.33PendingUS · Application
Profiling a job power and energy consumption for a data processing system

A process identifier for a job is collected. The job runs on a plurality of nodes. The job is identified using the process identifier. A node for the job is identified. An amount of power consumed by the node to run the job is determined.

CN 106,537,348 A#26375066 Most Cited · 4 citations0.4/yr · PR 1.21ActiveCN · Utility
A power aware job scheduler and manager for a data processing system

An indication of a mode for a job is received. An available power for the job is determined based on the mode. A first power for the job is allocated based on the available power. A first frequency for the job is determined based on the available power. The first power is…

US 9,927,857 B2#33959530 Most Cited · 3 citations0.4/yr · PR 0.97ActiveUS · Utility
Profiling a job power and energy consumption for a data processing system

A process identifier for a job is collected. The job runs on a plurality of nodes. The job is identified using the process identifier. A node for the job is identified. An amount of power consumed by the node to run the job is determined.

KR 20170021338 A#35844837 Most Cited · 2 citations0.2/yr · PR 1.24ActiveKR · Utility
A power aware job scheduler and manager for a data processing system

작업에 대한 모드의 표시가 수신된다. 모드에 기초하여, 작업에 대한 가용 전력이 결정된다. 가용 전력에 기초하여 작업에 대한 제1 전력이 할당된다. 가용 전력에 기초하여 작업에 대한 제1 주파수가 결정된다. 가용 전력에 기초하여 제1 전력이 조정된다.

US 9,921,633 B2#61771549 Most Cited · 1 citations0.1/yr · PR 0.74ActiveUS · Utility
Power aware job scheduler and manager for a data processing system

An indication of a mode for a job is received. An available power for the job is determined based on the mode. A first power for the job is allocated based on the available power. A first frequency for the job is determined based on the available power. The first power is…

EP 3,183,654 A1#129728088 Most Cited · 0 citations0.0/yr · PR 0.56PendingEP · Application
A power aware job scheduler and manager for a data processing system

An indication of a mode for a job is received. An available power for the job is determined based on the mode. A first power for the job is allocated based on the available power. A first frequency for the job is determined based on the available power. The first power is…

WO 2016/028371 A1#106892666 Most Cited · 0 citations0.0/yr · PR 0.56PendingWO · Application
A power aware job scheduler and manager for a data processing system

An indication of a mode for a job is received. An available power for the job is determined based on the mode. A first power for the job is allocated based on the available power. A first frequency for the job is determined based on the available power. The first power is…