The method for determining the energy content value (EIW) of electrochemical energy stores (1) by measuring the terminal voltage (U KL ) of an energy store (1) recognizes at least one reference value (BW) that is formed from a sum current (EI) flowing in the energy store (1) in…
Blessing Andreas
The device (100) has a current source (103) generating a measuring current (101). Another current source (104) generates a compensating current (105) in order to compensate a part of the measuring current. A detection circuit (106) detects a deviation of the measuring current…
The generation and monitoring of a load-independent output current for a level meter, pressure gauge, flowmeter or evaluation device are described. A current that is equal or unequal to the measuring current, but inverted relative thereto, can be generated continuously or within…
A fluid pressurizing system includes a group of three intensifiers each including a reciprocating piston operable through a cycle at a frequency to discharge a flow of ultra high pressure fluid. The group of intensifiers is operable in a normal mode and a service mode. In the…
A process for determining the energy content (EIW) of an electrochemical storage battery (1) by measuring the terminal voltage (UKL) of a storage battery (1) makes use of at least one reference value (BW) obtained from the total current (EI) which flows in the storage battery…
The generation and monitoring of a load-independent output current for a level meter, pressure gauge, flowmeter or evaluation device are described. A current that is equal or unequal to the measuring current, but inverted relative thereto, can be generated continuously or within…
The measuring, storing and actuating equipment accepts a reference signal (SR), which is proportional to intensity, via a manually-operated key (3) or via an electronic intensity-proportional or time-controlled transducer (4), or from a remote source via a data-bus. The…
Das Verfahren zur Ermittlung des Energieinhaltswertes (EIW) von elektrochemischen Energiespeichern (1) durch die Messung der Klemmenspannung (UKL) eines Energiespeichers (1) kennt mindestens einen Bezugswert (BW), der aus einem, in einer bestimmten Zeiteinheit (dt) und in einem…
A process for determining the energy content (EIW) of an electrochemical storage battery (1) by measuring the terminal voltage (UKL) of a storage battery (1) makes use of at least one reference value (BW) obtained from the total current (EI) which flows in the storage battery…
The programmable controller has a microprocessor (CPU) with a clock (28) and a read-only memory (5). An electrical connection allows external electric supply to be connected through a switch controlled by the programmable unit. A variety of detectors or switches can be mounted…
The generation and monitoring of a load-independent output current for a level meter, pressure gauge, flowmeter or evaluation device are described. A current that is equal or unequal to the measuring current, but inverted relative thereto, can be generated continuously or within…