A pile driving control apparatus for a pile driving system includes a hydraulic control system that controls a throttle of a pile driving hammer, and thereby controls an impact velocity of the hammer with a pile. A controller provides a control signal to the hydraulic control…
Bermingham Patrick D
A heavy duty rotary drive coupling is suitable for use in drilling holes in subterranean formations. The coupling includes passages for delivering drilling fluids to and from the bottom of the drill hole, and yet is designed to accommodate axial misalignment and can be rapidly…
A method for building a bridge, said bridge ( 4 ) comprising piers ( 6 ) and at least one deck ( 8 ), the method comprising: a cantilever step, wherein a girder ( 16 ) is set in a cantilevered position relative to a bank or to a constructed zone ( 12 ) of the bridge so that the…
A method for building a bridge, said bridge (4) comprising piers (6) and at least one deck (8), the method comprising: - a cantilever step, wherein a girder (16) is set in a cantilevered position relative to a bank or to a constructed zone (12) of the bridge so that the girder…
본 발명은 피어들(6) 및 적어도 하나의 데크(8)를 포함하는 교량을 건설하는 교량 건설 방법으로서, 상기 교량 건설 방법은: 거더(16)가 뱅크 또는 건설된 지역(12) 위에 걸린 제1 단부(24) 및 뱅크 또는 건설 지역(14) 위에 걸린 제2 단부(26)를 포함하도록, 거더가 교량의 건설된 지역(12) 또는 뱅크에 대하여 캔틸레버된(cantilevered) 위치에 설정되는, 캔틸레버 단계(68); 및 피어 요소 및 데크 요소(10)가 제1 단부(24) 및 제2 단부(26) 사이에서…
A method for building a bridge, said bridge comprising piers and at least one deck. The method including a cantilever step, wherein a girder is set in a cantilevered position relative to a bank or to a constructed zone of the bridge so that the girder comprises a first end…
A method for building a bridge, said bridge (4) comprising piers (6) and at least one deck (8), the method comprising: - a cantilever step, wherein a girder (16) is set in a cantilevered position relative to a bank or to a constructed zone (12) of the bridge so that the girder…
A method for building a bridge, said bridge (4) comprising piers (6) and at least one deck (8), the method comprising: - a cantilever step, wherein a girder (16) is set in a cantilevered position relative to a bank or to a constructed zone (12) of the bridge so that the girder…
A method for building a bridge, said bridge (4) comprising piers (6) and at least one deck (8), the method comprising: - a cantilever step, wherein a girder (16) is set in a cantilevered position relative to a bank or to a constructed zone (12) of the bridge so that the girder…
Método para construir un puente, comprendiendo dicho puente (4) pilares (6) y al menos una plataforma (8), comprendiendo el método: - una etapa de voladizo (68), en donde una viga (16) se coloca en una posición en voladizo en relación con un terraplén o con una zona construida…