An electrical energy storage system includes a battery configured to store electrical energy and discharge the stored electrical energy to an external system, a switch electrically connected to the battery and operable to connect the battery to the external system and disconnect…
Baumgartner Ryan A
A control system for a central energy facility with distributed energy storage includes a high level coordinator, a low level airside controller, a central plant controller, and a battery controller. The high level coordinator is configured to perform a high level optimization…
An electrical energy storage system includes a battery configured to store electrical energy and discharge the stored electrical energy to an external system, a switch electrically connected to the battery and operable to connect the battery to the external system and disconnect…
A system for controlling a subplant comprising one or more assets includes one or more memory devices having instructions stored thereon that, when executed by one or more processors, cause the one or more processors to perform operations including generating a design curve for…
A frequency response optimization system includes a battery, a power inverter, and a frequency response controller. The battery is configured to store and discharge electric power. The power inverter is configured to control an amount of the electric power stored or discharged…
An electrical energy storage system includes a battery configured to store electrical energy and discharge the stored electrical energy to an external system, a switch electrically connected to the battery and operable to connect the battery to the external system and disconnect…
A control system for a central energy facility with distributed energy storage includes a high level coordinator, a low level airside controller, a central plant controller, and a battery controller. The high level coordinator is configured to perform a high level optimization…
An electrical energy storage system includes a battery configured to store electrical energy and discharge the stored electrical energy to an external system, a switch electrically connected to the battery and operable to connect the battery to the external system and disconnect…
A system for controlling building equipment determines a degradation factor for a first asset of the building equipment by comparing a design curve for the first asset and operational data for the first asset. The design curve includes a plurality of data points that define an…
A system for controlling building equipment devices includes a processing circuit comprising a processor and memory storing instructions executed by the processor. The system is configured to generate a first combination profile indicating a number of active devices within each…
A frequency response optimization system includes a battery, a power inverter, and a frequency response controller. The battery is configured to store and discharge electric power. The power inverter is configured to control an amount of the electric power stored or discharged…
A method includes receiving, by one or more processors, user input describing characteristics of a central utility plant for a building, the user input comprising textual or audible input, identifying, by the one or more processors, a plurality of pieces of building equipment…
A system for controlling building equipment determines a degradation factor for a first asset of the building equipment by comparing a design curve for the first asset and operational data for the first asset. The design curve includes a plurality of data points that define an…
A system for controlling building equipment devices includes a processing circuit comprising a processor and memory storing instructions executed by the processor. The system is configured to generate a first combination profile indicating a number of active devices within each…
A method of selecting building equipment for serving a building including determining one or more hard constraints and one or more soft constraints for the building equipment, determining a plurality of possible combinations of building equipment to serve the building,…
A method includes providing a control algorithm that may include a constraint constraining production of the equipment below maximum values for a plurality of time steps, and dynamically adjusting the constraint by updating the maximum values as a function of predicted values of…
A frequency response optimization system includes a battery, a power inverter, and a frequency response controller. The battery is configured to store and discharge electric power. The power inverter is configured to control an amount of the electric power stored or discharged…
A method of selecting building equipment for serving a building including determining one or more hard constraints and one or more soft constraints for the building equipment, determining a plurality of possible combinations of building equipment to serve the building,…
A method includes providing a control algorithm that may include a constraint constraining production of the equipment below maximum values for a plurality of time steps, and dynamically adjusting the constraint by updating the maximum values as a function of predicted values of…
A control system operates equipment to consume, produce, or store one or more resources. The control system obtains modeling input describing a physical layout of the equipment. The modeling input may indicate a bidirectional connection between the equipment or a bidirectional…
A method includes receiving, by one or more processors, user input describing characteristics of a central utility plant for a building, the user input comprising textual or audible input, identifying, by the one or more processors, a plurality of pieces of building equipment…
A controller for one or more pumps in a central plant is configured to obtain first values of flow rate of a fluid provided by the one or more pumps to a building or campus and corresponding first values of a pressure differential across the building or campus during a first…