A method for deploying a floating platform includes storing buoys on a hull of the platform. Tension devices are mounted to the hull, each being connected by a line to one of the buoys. The operator tows the hull to a ballast down site while the buoys are stored on the hull.…
Basak Jayant
A method for deploying a floating platform includes storing buoys on a hull of the platform. Tension devices are mounted to the hull, each being connected by a line to one of the buoys. The operator tows the hull to a ballast down site while the buoys are stored on the hull.…
A method for deploying a floating platform includes storing buoys on a hull of the platform. Tension devices are mounted to the hull, each being connected by a line to one of the buoys. The operator tows the hull to a ballast down site while the buoys are stored on the hull.…
A method for deploying a floating platform at an offshore wellsite uses pull-down lines to provide stability to the platform while ballasting. The platform is equipped with a number of tension devices and towed to a staging site while at a first draft, At the staging site, the…
A method for deploying a floating platform includes storing buoys on a hull of the platform. Tension devices are mounted to the hull, each being connected by a line to one of the buoys. The operator tows the hull to a ballast down site while the buoys are stored on the hull.…
A method for deploying a floating platform at an offshore wellsite uses pull-down lines to provide stability to the platform while ballasting. The platform is equipped with a number of tension devices and towed to a staging site while at a first draft, At the staging site, the…
A method for deploying a floating platform includes storing buoys on a hull of the platform. Tension devices are mounted to the hull, each being connected by a line to one of the buoys. The operator tows the hull to a ballast down site while the buoys are stored on the hull.…
A method for deploying a floating platform at an offshore wellsite uses pull-down lines to provide stability to the platform while ballasting. The platform is equipped with a number of tension devices and towed to a staging site while at a first draft. At the staging site, the…
Un método para la instalación de una plataforma flotante (11), que comprende:(a) montar al menos un dispositivo de tensión (29) en un casco de la plataforma(11);(b) unir un cordón (27) desde el dispositivo de tensión (29) hasta una boya (25);(c) añadir lastre al casco (13),…
Framgangsmåte for å klargjøre en flytende plattform ved et brønnområde offshore som benytter nedtrekksliner for å gi stabilitet til plattformen mens den ballasteres. Plattformen er forsynt med et antall strekkanordninger og er slept til oppstillingsstedet. Ved oppstillingsstedet…
Framgangsmåte for å klargjøre en flytende plattform inkluderer lagring av bøyer i et skrog på plattformen. Strekk-anordninger er montert til skroget, hver er forbundet ved en line, til en av bøyene. Operatøren sleper skroget til et nedballasterings område, mens bøyene er lagret…
A method for deploying a floating platform includes storing buoys on a hull of the platform. Tension devices are mounted to the hull, each being connected by a line to one of the buoys. The operator tows the hull to a ballast down site while the buoys are stored on the hull.…
A method for deploying a floating platform at an offshore wellsite uses pull-down lines to provide stability to the platform while ballasting. The platform is equipped with a number of tension devices and towed to a staging site while at a first draft. At the staging site, the…
A method for deploying a floating platform at an offshore wellsite uses pull-down lines to provide stability to the platform while ballasting. The platform is equipped with a number of tension devices and towed to a staging site while at a first draft. At the staging site, the…