<P>PROBLEM TO BE SOLVED: To provide a method for discriminating secondary cell degradation capable of discriminating degradation conditions of secondary cells in high accuracy, by precisely correcting temperature characteristics of the internal impedance, according to…
Ando Ryohei
<P>PROBLEM TO BE SOLVED: To provide a nuclear constant preparation method for nuclear fuel for preparing a small-number group constant, using a continuous-energy Monte Carlo method, a reactor core design method using the method, a nuclear constant preparing device for the…
PROBLEM TO BE SOLVED: To enable use as a nuclear fuel of a light water reactor and a heavy water reactor, by performing at least a kind of coating of oxide, carbon, carbide and metal on the surface of nitride nuclear fuel particles. SOLUTION: Particles 1 containing nitride…
<P>PROBLEM TO BE SOLVED: To provide a method and a program for calculating burnup which makes it possible to accurately calculate fluctuations in the amounts of evaluation due to the burnup of a system to be evaluated or neutron irradiation in more burnup conditions.…
PROBLEM TO BE SOLVED: To nondestructively measure a heating rate with every nuclide from measurement of a neutron, a γ ray, and a heating value emitted by spent fuel. SOLUTION: A neutron flux is derived (2) by neutron measurement (1) of the neutron emitted from irradiated fuel,…
PURPOSE:To store densily a spent fuel assembly while securing its critical safety, by storing a spent fuel assembly having a long cooling period at the center of a cask for spent fuel assembly, while storing a spent fuel assembly having a short cooling period around that.…
PURPOSE:To provide a fuel assembly which can suppress exceeding of neutron multiplication rate and control the multiplication rate evenly for whole operation cycle, improve cooling characteristics and does not lead to complication of assembling and disassembling work.…
PROBLEM TO BE SOLVED: To calculate the burnup of reactor fuel containing Pu accurately to lower burnup by calculating neutron discharge rate as a correlation function with burnup using a specific equation and making a burnup value converged in repeating calculation using a…
PURPOSE:To improve accuracy by combining tabulated reactivity coefficients and the microscopic cross sectional areas based on the atom density and lattice calculation of Pu isotope and Am isotope which are calculated in actual power history conditions. CONSTITUTION:Obtained is…
PURPOSE:To enable suppression of an output spike at a control rod withdrawal, by using an Hf material as a control rod element and by making an end tip of the control rod to be of a small diameter. CONSTITUTION:A control rod element 20 is formed with a metal or an alloy…
PURPOSE:To increase the volume of the water existing between fuel assemblies and to increase the subcritical degree of a reactor by forming the upper part of a channel box along the water gap into which control rods are not inserted to the thickness smaller than the thickness of…
PURPOSE:To flatten the excess reactivity in a core by using a moderator rod including burnable poison charged with burnable poison in the annulus part of moderator rod with dual pipe structure. CONSTITUTION:This fuel assembly 14 is constituted of fuel rods 16 charged with…
PURPOSE:To lessen the difference of reactivity during output and cool temperature operation by providing a water rod and an internal gap and decentering one of these or the side of water gap without inserting a control rod from the center in a channel box. CONSTITUTION:A D…
<P>PROBLEM TO BE SOLVED: To provide a nuclear constant producing device of nuclear fuel, capable of creating accurate nuclear constant by applying continuous energy Monte Carlo method to finite device, and to provide a core-design device capable of core design with high…
PROBLEM TO BE SOLVED: To evaluate a neutron emission rate of Cm244 from a spent fuel. SOLUTION: A generation amount of a neutron emission nuclide Cm244 provided by combustion calculation based on respective data when loaded in a core of a nuclear reactor to be burnt by neutron…
PURPOSE:To secure a sufficient reactor stop margin even when a cycle combustion extent is increased and uranium 235 concentration extent increases by setting the width of a narrow water gap a half as large as the width of a wide water gap. CONSTITUTION:The fuel assembly is so…
PURPOSE:To improve the economics and thermal soundness of fuel and to increase a reactor shutdown margin without enlarging a pressure vessel. CONSTITUTION:Four small-sized fuel assemblies 2 each having a smaller sectional area than an existing fuel assembly are bundled up in a…
PROBLEM TO BE SOLVED: To provide the simple, efficient evaluating method for change in concentration of atomic-fuel material, which can evaluate the concentration of a respective nuclear species by analytical computation and has the short time required for the computation.…
<P>PROBLEM TO BE SOLVED: To reduce the time required for restoration in a disaster recovery system. <P>SOLUTION: The DR system 8 is provided with a primary system data center 2 and a DR data center 6. The primary system data center 2 and the DR data center 6 are…
PURPOSE:To allow the reduction characteristic of the poison reactivity of a moderator rod with a burnable poison therein to vary linearly. CONSTITUTION:In a fuel assembly 17, wherein nine columns and nine lines of fuel rods 1 9, a moderator rod 10 comprising a burnable poison…
(57)【要約】本公報は電子出願前の出願データであるた め要約のデータは記録されません。
PURPOSE:To prevent an increase in pressure drop and to increase the water to fuel volume ratio in a fuel assembly by providing a diameter changing part of a streamline shape which is gradually decreased in diameter from the lower to the upper part between the upper part and the…
<P>PROBLEM TO BE SOLVED: To reduce system stop time for stopping processing of the whole system including a server, for restarting the server. <P>SOLUTION: A management system 100 includes a first management server 102 and a second management server 104. One of the…
PROBLEM TO BE SOLVED: To provide a travelable pipe rail travel unit while avoiding metal fittings provided on travel pipes for anchoring beam pipes vertically crossing in a plan view above the travel pipes.SOLUTION: A pipe rail travel unit, in which first, second, and third…