Patents
JP 2010067114 A#2667742 Most Cited · 27 citations1.7/yr · PR 4.82ActiveJP · Utility
Production energy management system

<P>PROBLEM TO BE SOLVED: To link the energy of a process or device (information on the amount of emitted CO<SB>2</SB>) with information on production (the number of pieces, operational status, quality) to compute and manage the amount of emitted…

JP 2004178156 A#4092556 Most Cited · 20 citations0.9/yr · PR 6.44ExpiredJP · Utility
Operation plan decision support system

<P>PROBLEM TO BE SOLVED: To support the decision of an operation plan by not only deriving an optimum operation plan for an energy supply system, but also providing the analytic result for the plan together to an operator. <P>SOLUTION: This operation plan decision…

JP 2004021712 A#6155022 Most Cited · 15 citations0.7/yr · PR 3.48ExpiredJP · Utility
Facility diagnostic support system

<P>PROBLEM TO BE SOLVED: To contribute to the support, improvement in efficiency of operation management, and improvement in quality of a facility maintenance service performed every day by use of collected data. <P>SOLUTION: This facility diagnostic support system…

JP 2008157490 A#7257686 Most Cited · 13 citations0.7/yr · PR 4.24ActiveJP · Utility
Device and method for controlling operation of refrigerating device

<P>PROBLEM TO BE SOLVED: To provide an operation control device and an operation control method of a refrigerating machine capable of properly selecting an operating state of the refrigerating machine depending on the situation. <P>SOLUTION: A calculation means 21…

JP 2007264704 A#12350257 Most Cited · 8 citations0.4/yr · PR 6.99ActiveJP · Utility
Energy management system

<P>PROBLEM TO BE SOLVED: To provide an energy management system, capable of performing cost reduction management by accurate energy saving by executing specific energy basic unit management based on information collected in real-time base for each energy type for…

JP S591807 A#17125125 Most Cited · 6 citations0.1/yr · PR 1.85ExpiredJP · Utility
Ball seat press-in method
Inventors: Abe HirotoAssignee: Rhythm Motor Parts MfgFiled 1982-06-29

PURPOSE:To prevent a rubber ring from partially remaining or being squeezed out from a socket when pressed it into the socket, by applying an air pressure on the rubber ring. CONSTITUTION:All the gaps in a service stand are closed by O-rings 141, 142 and 143. While a clamp 13 is…

KR 20070096819 A#16711752 Most Cited · 6 citations0.3/yr · PR 2.16ActiveKR · Utility
Energy management system

An energy management system is provided to manage energy in a basic unit and reduce costs for energy with high accuracy by monitoring information collected in real-time by each energy type. A power generation system energy management device(400) collects energy generation data…

JP 2010067113 A#19249821 Most Cited · 5 citations0.3/yr · PR 2.41ActiveJP · Utility
Production energy monitoring control system

<P>PROBLEM TO BE SOLVED: To receive energy information and production information of a production facility, and perform automatic drill-down analysis for CO<SB>2</SB>emission in a factory, a production plant or the like, thereby remarkably reducing man hours to…

JP 2000189147 A#23299410 Most Cited · 4 citations0.1/yr · PR 1.74ExpiredJP · Utility
Liquor and its production

PROBLEM TO BE SOLVED: To produce a liquor without generating a large quantity of sugar and with little allergic reactions and provide a method for producing the same. SOLUTION: This liquor is obtained by fermenting rice treated to remove proteins having a mass ratio B/A to be…

CN 112,750,500 A#29091899 Most Cited · 3 citations0.6/yr · PR 1.36ActiveCN · Utility
Apparatus, method and storage medium

The invention provides a device, a method and a storage medium. The present invention provides an apparatus comprising: a setting unit that sets operation contents for a manufacturing system that manufactures a manufacturing target object; a first acquisition unit that acquires…

JP 2021071932 A#28826368 Most Cited · 3 citations0.6/yr · PR 1.41ActiveJP · Utility
Apparatus, method and program

To provide a manufacturing system adapted to obtain a suitable operation content for the manufacturing system.SOLUTION: An apparatus comprises: a setting section that sets up an operation content for a manufacturing system to manufacture an object-to-manufacture; a first…

JP H0587393 A#30687501 Most Cited · 3 citations0.1/yr · PR 1.20ExpiredJP · Utility
Air flow rate regulator for air conditioning floor blow-off port

PURPOSE:To condition the air uniformly in a residence room by regulating a blow-off air flow rate equally to a set air flow rate by comparing an air speed signal from an air speed sensor provided in a floor blow-off port with an air flow rate set signal. CONSTITUTION:An air…

KR 20080074753 A#27425195 Most Cited · 3 citations0.2/yr · PR 5.21ActiveKR · Utility
Co2 discharge calculation system and co2 discharge calculation method
Inventors: Takagi Susumu, Abe Hiroto, Sakuraba SatoshiAssignee: Yokogawa Electric CorpFiled 2008-02-04

A system and a method for CO2 discharge amount are provided to predict the CO2 discharge amount accurately by adding up a predicted consumption load amount and a CO2 discharge unit amount and calculate the CO2 discharge amount regarding each of energy types corresponding to…

JP 2008192103 A#35718097 Most Cited · 2 citations0.1/yr · PR 1.26ActiveJP · Utility
Carbon dioxide emission amount computing system and carbon dioxide emission amount computing method
Inventors: Takagi Susumu, Abe Hiroto, Sakuraba SatoshiAssignee: Yokogawa Electric CorpFiled 2007-02-08

<P>PROBLEM TO BE SOLVED: To provide a carbon dioxide emission amount computing system and a carbon dioxide emission amount computing method that can appropriately manage the emission amount of carbon dioxide. <P>SOLUTION: A receiving means 11 receives input operation…

TW 200,802,150 A#37519191 Most Cited · 2 citations0.1/yr · PR 1.10ActiveTW · Utility
Energy management system

This invention provides an energy management system which performs a management about unit cost for energy production based on the information collected in real time for every energy classification about manufacture energy data and consumption energy data of a production system…

US 2021132556 A1#61950714 Most Cited · 1 citations0.2/yr · PR 0.74PendingUS · Application
Apparatus, method and storage medium

An apparatus is provided, which includes a setting unit for setting an operation content for a manufacturing system configured to manufacture an object to be manufactured, a first acquisition unit for acquiring a posterior state parameter set indicating a state of at least one…

EP 3,816,735 A1#64451057 Most Cited · 0 citations0.0/yr · PR 0.56PendingEP · Application
Apparatus, method, and program

An apparatus is provided, which includes a setting unit for setting an operation content for a manufacturing system configured to manufacture an object to be manufactured, a first acquisition unit for acquiring a posterior state parameter set indicating a state of at least one…

JP 2004337008 A#130822268 Most Cited · 0 citations0.0/yr · PR 0.56ExpiredJP · Utility
Method for producing agricultural product judging production area and production year and method for judging the same

<P>PROBLEM TO BE SOLVED: To contribute to optimization of an indication of agricultural products including rice by establishing a system for judging not only the variety but also the production area and production year. <P>SOLUTION: The feature is as follows. A…

JP 2015209711 A#63617783 Most Cited · 0 citations0.0/yr · PR 0.56ActiveJP · Utility
Multi-layered glass gasket and fixture provided with multi-layered glass
Inventors: Numata Mitsuru, Kamiyama Satoshi, Abe HirotoAssignee: Ykk ArchitecturalFiled 2014-04-28

PROBLEM TO BE SOLVED: To provide a cheap multi-layered glass gasket in which water drainage performance of the sealing part of the multi-layered glass is improved.SOLUTION: A lower multi-layered glass gasket 50 fitted to the lower edge part of multi-layered glass 3 comprises a…

JP 2021113468 A#150439790 Most Cited · 0 citations0.0/yr · PR 0.56ActiveJP · Utility
Duct construction method

To provide a duct construction method that can shorten the construction period of a building.SOLUTION: There is provided a method for constructing a vertical duct for building equipment in building construction work, including a step of lifting a duct unit 10 consisting of ducts…

JP 2022011599 A#125436334 Most Cited · 0 citations0.0/yr · PR 0.56ActiveJP · Utility
Spacer for multi-layered face material and multi-layered face material
Inventors: Oku Koichi, Mizuno Masakazu, Abe HirotoAssignee: Ykk ArchitecturalFiled 2020-06-30

To connect end parts of spacer members of double glazing to each other so as to obtain required connection strength while using a connection member made of resin.SOLUTION: A spacer (4) for a double glazing (1) includes: spacer members (11) whose end parts (11a) are abutted on…

JP 2023014791 A#83584780 Most Cited · 0 citations0.0/yr · PR 0.56ActiveJP · Utility
Service vehicle management system and service car management method and service vehicle management program and sensor device
Inventors: Endo Yuji, Abe HirotoAssignee: Takasago Thermal EngineeringFiled 2021-07-19

To display which user will use a service vehicle in a manner of visually easy understanding.SOLUTION: The service vehicle management system is a service vehicle management system that manages a service vehicle used in work inside an architectural structure having multiple tiers.…