An inductive device ( 105 ) is formed above a substrate ( 225 ) having a conductive coil formed around a core ( 109 ). The coil comprises segments formed from a first plurality of bond wires ( 113 ) and a second plurality of bond wires ( 111 ). The first plurality of bond wires…
Yaping Zhou
A semiconductor package uses various forms of conductive traces that connect to die bond pads via bond wires. In one form, adjacent bond wires are intentionally crossed around midpoints thereof to reduce self-inductance of the conductors and to minimize self-inductance. In…
A semiconductor device has a die ( 10 ) overlying and electrically connected to a support structure ( 11 ), such as a substrate or a lead frame, via a plurality of interconnects. Aggressor interconnects ( 32, 38 ) are noise sources to victim interconnects ( 29, 59 ) carrying…
The invention relates to a blast method to construct the pile which has a composite three-section pedestal pile body and a cast-in-situ reinforced concrete pile body. The invention comprises the technique procedures that: a. an immersed tube with a metal pile crown is sunk to…
The present is prefabricating and in-situ reinforcing concrete casting process for constructing high bearing capacity combined pile stem. The process includes the following steps: 1. immersing immersed tube with metal pile head into hardpan to design elevation; 2. taking out the…
The invention relates to a mechanical pile forming method for there level belled composite pile body, comprising the craft steps that: a, a sinking pipe with a metal pile head is immersed into hardpan to design elevation; b, the metal pile head is taken out; c, a lower base…
The three-stage under-reamed prefabricating and in-situ reinforcing concrete casting process for constructing combined pile stem includes the following steps: 1. immersing immersed tube with metal pile head into hardpan to design elevation; 2. taking out the metal pile head; 3.…
The blasting piling process of three-stage under-reamed combined pile stem includes the following steps: 1. immersing immersed tube with metal pile head into hardpan; 2. taking out the metal pile head; 3. forming the lower base space through blasting, drawing the immersed tube…
The present invention relates to construction of building pile foundation engineering, and is especially piling process of two-stage under-reamed prefabricated pile stem with high bearing capacity. The piling process includes the following steps: 1. immersing immersed tube with…
The present invention is extrusion piling process of three-stage under-reamed pile stem with high bearing capacity. The extrusion piling process includes the following steps: 1. immersing immersed tube with metal pile head into hardpan; 2. taking out the metal pile head; 3.…
A process for preparing thermoshrinking PET sleeve tube includes such steps as proportionally mixing PET, POE, TPEE and PC lubricant, drying, extruding out at 5 control temp values, cooling by cold water, pumping the compressed in the semi-finished tube arranged in a shape…
The present invention is mixed piling process of three-stage under-reamed pile stem. The mixed piling process includes the following steps: immersing immersed tube with metal pile head into hardpan, taking out the metal pile head, forming the lower base space, drawing the…
The present invention is extruding piling process of three-stage under-reamed pile stem. The extruding piling process includes the following steps: 1. immersing immersed tube with metal pile head into hardpan; 2. taking out the metal pile head; 3. forming the lower base space,…
The present is prefabricating and in-situ reinforcing concrete casting process for constructing high bearing capacity combined pile stem. The process includes the following steps: 1. immersing immersed tube with metal pile head into hardpan to design elevation; 2. taking out the…
The present is prefabricating, in-situ reinforcing concrete casting and blasting process for constructing high bearing capacity combined pile stem. The process includes the following steps: 1. immersing immersed tube with metal pile head into hardpan to design elevation; 2.…
The present invention is mixed piling process of three-stage under-reamed pile stem with high bearing capacity. The mixed piling process includes the following steps: 1. immersing immersed tube with metal pile head into hardpan; 2. taking out the metal pile head; 3. forming the…
The present invention relates to construction of building pile foundation engineering, and is especially blasting piling process of two-stage under-reamed prefabricated pile stem. The piling process includes the following steps: 1. immersing immersed tube with metal pile head…
The three-stage under-reamed prefabricating and in-situ reinforcing concrete casting process for constructing combined pile stem includes the following steps: 1. immersing immersed tube with metal pile head into hardpan to design elevation; 2. taking out the metal pile head; 3.…
The present invention is blasting piling process of three-stage under-reamed combined pile stem with high bearing capacity. The blasting piling process includes the following steps: 1. immersing immersed tube with metal pile head into hardpan; 2. taking out the metal pile head;…
The present invention relates to construction of building pile foundation engineering, and is especially mechanical piling process of two-stage under-reamed prefabricated pile stem. The mechanical piling process includes the following steps: 1. immersing immersed tube with metal…
The invention relates to a method for mechanically forming a pile which has a pile body combined by a third class base expansion prefabrication and cast-in-place steel concrete. The method comprise the following process steps that: a. an immersed tube with a metal pile head is…
The utility model relates to a rain-sheltering and sun shading device, in particular to a rain-sheltering and sun shading awning of an electric bicycle. The rain-sheltering and sun shading awning adopts the technical scheme that the awning comprises an awning surface and a…