The invention discloses a method for calling and configuring imaging satellite resources. The method specifically includes the steps that task allocation problems are classified into one of a capacity overload problem, an energy overload problem, an energy and capacity overload…
Xing Lining
The invention discloses an operator construction method of a single-star scheduling. The operator construction method comprises the following steps that a question classifier which is constructed based on a distribution form of a task set conducts classification on single-star…
The invention discloses an imaging satellite scheduling problem model building method based on a body. The method comprises the following specific steps of (1) treating tasks, resources, a scheduling time range, restraints, goals, preferences and scheduling demands as related…
The invention discloses an autonomous-collaboration-oriented separated module satellite control structure. The autonomous-collaboration-oriented separated module satellite control structure comprises multiple-module collaboration layers, single module autonomous layers and a…
The invention discloses a dynamic programming based look-ahead and heuristic satellite task programming algorithm. As for a certain time of look-ahead operation, the current programming task is assumed to be t[i], the current programming time is s[0]<i>, the solving target…
The invention discloses a two-stage layering hybrid system of a separation module spacecraft. An operation control and mission planning portion comprises a decision management layer and a behavior executing layer. The decision management layer is provided with two management…