Wray John William
125,841. Wray, J. W. July 9, 1918. Shuttle-changing mechanism. - In a loom with two or more shuttles successively inserting two picks, a weft feeler opetates in the shuttle having least weft and on substantial exhaustion of the weft actuates mechanism whereby a two-compartment…
4345. Stubley, G., and Wray, J. W. Feb. 22. Looms, checking shuttles in; picking-motions.-In an ordinary loom with two shuttle boxes, on the guide-spindles d and between the picker e and the bracket f is fitted the T-shaped piece n or the 'adjuster,' Fig. 3, the lengths…
28,978. Wray, J. W. Dec. 19. Loom shuttles ; shuttle-changing mechanism; stopmotions.-The shuttle is provided with a lever B having at one end a feeling-finger D which bears against the weft E, and at the other end a finger F which normally holds up a stud or projection G on a…
22,829. Wray, J. W. Oct. 16. Loom shuttle - changing mechanism. - When the weft is substantially exhausted, a spring swell or projection 36, Fig. 1. on the shuttle drops into position, as described in Specification No. 28,978, A.D. 1906, to actuate a finger A on a bracket B on a…
16,528. Wray, J. W. July 15. Weft-replenishing mechanism; shuttles.-The shuttle is provided with a weft-feeler having a nose G projecting towards the bobbin and a nose E projecting through a slot in the shuttle, the feeler being connected to or forming part of a blade-spring H,…