Wind Tower Tech Llc
A concrete wind turbine tower segment is provided with a bearing plate formed by a plurality of individual smaller plates secured within the concrete body of the tower segment. The tower segment may include an anchor bar cage assembly made of an embedded plate with a plurality…
A system and method for installing a post-tensioning tendon (130) in an equipment tower (100). A sheave frame (196) attaches to anchor rods (140), and a pulley (198) is mounted to the sheave frame through which a hoisting cable (197) is passed for connection to an end (138) of…
A concrete wind turbine tower segment (132) is provided with a bearing plate (154) formed by a plurality of individual smaller plates (150) secured within the concrete body of the tower segment (132). The tower segment (132) may include an anchor bar cage assembly (180) made of…
A system and method for installing a post-tensioning tendon (130) in an equipment tower (100). A sheave frame (196) attaches to anchor rods (140), and a pulley (198) is mounted to the sheave frame through which a hoisting cable (197) is passed for connection to an end (138) of…
A system and method for installing a post-tensioning tendon ( 130 ) in an equipment tower ( 100 ). A sheave frame ( 196 ) attaches to anchor rods ( 140 ), and a pulley ( 198 ) is mounted to the sheave frame through which a hoisting cable ( 197 ) is passed for connection to an…
An equipment tower (100) having a ladder (130) formed of a plurality of ladder segments (132) each joined to a respective tower segment (105) by a pivotal connection (152) prior to the tower segments being stacked during erection of the tower. The pivotal connection provides a…
A tower can include a plurality of annular tower sections connected to and aligned with one another, an internal support structure spanning at least a length of the tower, and a ladder incorporated into the internal support structure.
A concrete wind turbine tower segment is provided with a bearing plate formed by a plurality of individual smaller plates secured within the concrete body of the tower segment. The tower segment may include an anchor bar cage assembly made of an embedded plate with a plurality…
An equipment tower) having a ladder formed of a plurality of ladder segments each joined to a respective tower segment by a pivotal connection prior to the tower segments being stacked during erection of the tower. The pivotal connection provides a degree of freedom of movement…
A precast concrete post-tensioned segmented equipment tower (100) including a lower segment (1078) of a relatively larger diameter, an upper segment (109) of a relatively smaller diameter, and a transition segment (116) there between, with a post-tensioning tendon (200) spanning…
An equipment tower (100), comprising: a foundation (102), a cast-in-place concrete foundation (120) extending vertically from the foundation, and a tower section (104, 106, 108) extending vertically from the foundation. The equipment tower is constructed on site with a set of…
One kind is for system and method for the tensioning tendon (130) in equipment pylon (100) by after.Pulley yoke (196) is attached to anchor pole (140), and pulley (198) is installed to pulley yoke, and hoisting cable (197) is by the pulley to be connected to the end (138) of…
An equipment tower includes a foundation, a cast-in-place concrete plinth extending vertically from the foundation, and a tower portion extending vertically from the plinth. The equipment tower is constructed at a site having a set of tower specific parameters, and at least one…
The present disclosure is directed to
An equipment tower (100) includes a foundation (102), a cast-in-place concrete plinth (120) extending vertically from the foundation, and a tower portion (104, 106, 108) extending vertically from the plinth. The equipment tower is constructed at a site having a set of tower…
A concrete wind turbine tower segment (132) is provided with a bearing plate (154) formed by a plurality of individual smaller plates (150) secured within the concrete body of the tower segment (132). The tower segment (132) may include an anchor bar cage assembly (180) made of…
A kind of equipment pylon (100) of the segmentation of precast concrete post-tensioning, the equipment pylon includes the relatively large compresses lower section of diameter (107), the relatively small top section of diameter (109) and the transition zone (116) between top…
A concrete wind turbine tower section (132) is provided with a support plate (154) formed of a plurality of individual smaller plates (150) secured within the concrete body of the tower section (132). The tower section (132) may include a bolt frame assembly (180) made of an…
An equipment tower having a ladder formed of a plurality of ladder segments each joined to a respective tower segment by a pivotal connection prior to the tower segments being stacked during erection of the tower. The pivotal connection provides a degree of freedom of movement…
An equipment tower includes a foundation, a cast-in-place concrete plinth extending vertically from the foundation, and a tower portion extending vertically from the plinth. The equipment tower is constructed at a site having a set of tower specific parameters, and at least one…
A crane system includes a structural truss positioned within a central opening defined by an inside surface of an annular tower, a crane mast connected to an outside surface of the annular tower, and a jib arm connected to the crane mast.
An equipment tower (100) having a ladder (130) formed of a plurality of ladder segments (132) each joined to a respective tower segment (105) by a pivotal connection (152) prior to the tower segments being stacked during erection of the tower. The pivotal connection provides a…
A kind of equipment pylon (100), there is the equipment pylon cat ladder (130) formed by multiple cat ladder segments (132), each cat ladder segment to be that stack tower segments during setting up pylon is linked to corresponding tower segments (105) by pivotal connector (152)…
A precast concrete post-tensioned segmented equipment tower including a lower segment of a relatively larger diameter, an upper segment of a relatively smaller diameter, and a transition segment there between, with a post-tensioning tendon spanning these segments and imparting a…