Patents
Assignee / Organization

Wemarathon

27Total Forward Citations
5Indexed Patents
5Avg Citations / Patent
3Portfolio H-Index
Key Inventors: Motahar Ramtin
US 2020057825 A1#9070090 Most Cited · 11 citations1.8/yr · PR 2.71PendingUS · Application
System for improving the design, construction and operation of a structure
Inventors: Motahar RamtinAssignee: WemarathonFiled 2017-10-24

The present disclosure relates to a system and method for optimizing building design, construction and operation by tracking post-construction operational data, along with design and construction data. The system addresses the energy performance gap associated with modern…

WO 2018/081171 A1#15099786 Most Cited · 7 citations0.9/yr · PR 1.83PendingWO · Application
System for improving the design, building and operation of a structure
Inventors: Motahar RamtinAssignee: WemarathonFiled 2017-10-24

The present disclosure relates to a system and method for optimizing building design, construction and operation by tracking post-construction operational data, along with design and construction data. The system addresses the energy performance gap associated with modern…

US 2021326495 A1#23223578 Most Cited · 4 citations0.8/yr · PR 1.78PendingUS · Application
System and method for inspecting a structure to improve the design, construction and operation of a structure
Inventors: Motahar RamtinAssignee: Motahar Ramtin, WemarathonFiled 2019-05-02

The present disclosure relates to a system and method for optimizing building design, construction and operation by tracking construction and operational data using one or more transient sensor systems. The system addresses build out, energy performance, and other gaps…

WO 2019/213457 A1#29062145 Most Cited · 3 citations0.4/yr · PR 1.37PendingWO · Application
System and method for inspecting a structure to improve the design, construction, and operation of the structure
Inventors: Motahar RamtinAssignee: Wemarathon, Motahar RamtinFiled 2019-05-02

The present disclosure relates to a system and method for optimizing building design, construction and operation by tracking construction and operational data using one or more transient sensor systems. The system addresses build out, energy performance, and other gaps…

US 11,436,386 B2#44512282 Most Cited · 2 citations0.5/yr · PR 0.90ActiveUS · Utility
System for improving the design, construction and operation of a structure
Inventors: Motahar RamtinAssignee: Wemarathon, Joulea LlcFiled 2017-10-24 · Granted 2022-09-06

The present disclosure relates to a system and method for optimizing building design, construction and operation by tracking post-construction operational data, along with design and construction data. The system addresses the energy performance gap associated with modern…