A heave compensator for a drill ship with a derrick and hoist system with a dead line provides a line reservoir on the dead line. The dead line is reciprocated to move the hook load relative to the vessel to control it relative to the sea bed. The line reservoir is expanded or…
Welsh; Walter Thomas
Lower pipe stand racking combs are arranged to fold down from a side of the derrick at selected locations above the rig floor. In each racking comb an array of parallel fingers extend in a spaced array from a pivotable spine. The spine rotates to raise the fingers to a near…
A drilling rig derrick is adapted to direct the hoist lines reeved between the crown block and the traveling block such that they enter both in a vertical direction if the traveling block is moved laterally to clear the work area over the rotary table. Arrangements are provided…
The line system on a drilling rig is arranged to place the dead line clamp at the upper end of the derrick. A dead line anchor sheave is preferably located to accept wraps of the dead line to insure reduced load on the dead line clamp. The anchor sheave is preferably lockable to…
Lower pipe stand racking combs are arranged to fold down from a side of the derrick at selected locations above the rig floor. In each racking comb an array of parallel fingers extend in a spaced array from a pivotable spine. The spine rotates to raise the fingers to a near…