Embodiments of the present invention generally relate to a sealant for forming durable plugs in wells and method for completing or abandoning wells. In one embodiment, a method of plugging a wellbore includes mixing sealant; mixing cement; pumping the cement and sealant into the…
Watters Larry
A method can include introducing a particulate diverting agent into a first fracture within an underground reservoir formation. The particulate diverting agent can at least partially hydraulically isolate the first fracture. The particulate diverting agent can also be a…
A two part epoxy resin system is surface mixed in a method of plugging an abandoned well. This surface mixed epoxy resin is then placed in the well at the desired plugging depth. Finally, the mixture in situ forms a cementing plug.
A method of plugging wells wherein cementitious materials (like Portland cement) are formed into pellets that can be dumped or dropped into a well that is filled with an aqueous solution. The pellets will fall quickly to the bottom of the well or mechanically placed barrier, and…
A two part epoxy resin system is surface mixed in a method of remediating an active well. This surface mixed epoxy resin is then placed in the well at the desired remediation depth. Finally, the mixture in situ forms a cement plug.
In a coal preparation plant which receives a raw coal feed and separates the raw coal feed into clean coal feed and refuse feed slurries using a media based separation process, an apparatus is provided for use therein. The inventive apparatus simultaneously processes the raw…
A method of mitigating proppant settling in a hydraulic fracture in order to better suspend the proppant as well as ensure a more uniform pack, by mixing a pre-determined volume percent of low density additive, such as glass beads or other suitable material, such as polylactic…
Systems, methods and compositions for temporary sealing fractures in subterranean formations are herein disclosed. According to one embodiment, a composition comprising at least one constituent for temporary sealing a fracture in a subterranean well is provided. The degradation…
A system is provided for controlling the operation and performance of water-only cyclones used in a coal preparation plants for separating a fine raw coal slurry into fine coal and fine refuse slurries. The inventive system includes a variable speed pump feeding the fine raw…
A two part encapsulated cementing system is surface mixed and then placed downhole in a method of remediating an active well. This mixture is then placed downhole where it is allowed to degrade in the well fluid allowing for the formation of a cement plug.
A method can include introducing a particulate diverting agent into a first fracture within an underground reservoir formation. The particulate diverting agent can at least partially hydraulically isolate the first fracture. The particulate diverting agent can also be a…
In a coal preparation plant which receives a raw coal feed and separates the raw coal feed into a clean coal feed and a refuse feed, an apparatus is provided for receiving and mixing the raw coal feed with water. The inventive apparatus includes a deslime screen assembly…
A method can include introducing a particulate diverting agent into a first fracture within an underground reservoir formation. The particulate diverting agent can at least partially hydraulically isolate the first fracture. The particulate diverting agent can also be a…
In a mineral preparation plant which receives a raw mineral feed and separates the raw mineral feed into a clean mineral and a refuse, an apparatus is provided for use therein. The inventive apparatus retains dilute media which is formed as a by-product of the separation…
In a coal preparation plant which receives a raw coal feed and separates the raw coal into clean coal and refuse, an apparatus is provided for use therein. The inventive apparatus is a combined sump common to the heavy media vessel and heavy media cyclone circuits used for…
A two part epoxy resin system is surface mixed in a method of primary cementing a well. This surface mixed epoxy resin is then placed in the annulus of the well. Finally, the mixture in situ forms a hard impermeable mass.
A method of primary cementing well is provided utilizing a cement and cement activator cementing composition, in which one of the components is first placed in the annulus of the well. Next, the other component is placed in the annulus above the first placed component. Densities…
A two part epoxy resin system is surface mixed in a method of primary cementing a well. This surface mixed epoxy resin is then placed in the annulus of the well. Finally, the mixture in situ forms a hard impermeable mass.
In a coal preparation plant which receives a raw coal feed and separates the raw coal feed into a clean coal feed and a refuse feed, an apparatus is provided for use therein. The inventive apparatus mixes the sized raw coal feed particles with a slurry of media and water used…
Disclosed herein is a temporary wellbore sealant, comprising water, a gelling agent; and a filler, wherein: the filler has a lower specific gravity than the water of the sealant; and the sealant has a lower specific heat than the water of the sealant and a method of temporarily…
This invention relates to enhancing hydrocarbon production from a subterranean formation via a well completed with a gravel pack. Gravel packs suffer plugging and damage over time from produced particles and other plugging materials brought into the pack as production continues.…
Flexible polyurethane foams are made using certain hydrolysable silane compounds in the foam formulation. The hydrolysable silane compounds contain at least one isocyanate-reactive group and at least one hydrolysable silane group. The presence of the hydrolysable silane compound…
A method of remediation of a well is provided utilizing a cement and cement activator plugging composition, in which one of the components is first placed in the well at the desired remediation depth. Next, the other component is placed in the well above the first placed…
A two part epoxy resin system is mixed downhole in a method of primary cementing a well. Using this two part epoxy resin and activator system, one of the components is first placed in the annulus of the well at the desired plugging depth. Next, the other component is placed in…
A method of plugging wells wherein cementitious materials (like Portland cement) are formed into pellets that can be dumped or dropped into a well that is filled with an aqueous solution. The pellets will fall quickly to the bottom of the well or mechanically placed barrier, and…