A method of preventing or treating lost circulation during the drilling of a well comprises the addition, at concentration ranging between about 0.5 and 6 pounds per barrel, of water-dispersible fibers having a length between about 10 and 25 mm, for instance glass or polymer…
Vidick Benoit
A fibre-reinforced, low density cement system for the control of lost circulation during the drilling of subterranean wells, generally comprising a cement particle mixture having a specific granulometric characterization and alkaline resistant fibres, such as fibres composed of…
Apparatus for stabilising a borehole includes a delivery pipe (16) for delivering a treatment fluid to a zone of the borehole to be stabilised, the pipe having an opening (22) such that a treatment fluid can flow from the pipe into the zone; and a flexible, expandable sleeve…
Compositions of lost circulation materials are provided that are useful for identifying the location of fluid loss in a wellbore. The compositions include additives which enhance a property of the composition such that they can be detected by an LWD or MWD tool capable of…
A method of preventing or treating lost circulation during the drilling of a well comprises the addition, at concentration ranging between about 0.5 and 6 pounds per barrel, of water-dispersible fibers having a length between about 10 and 25 mm, for instance glass or polymer…
A method of lining tubing within a wellbore comprises applying a polymerisable fluid composition containing a photoinitiator to the interior surface of that tubing and initiating polymerisation of the composition by exposing it to actinic radiation, suitably light or ultraviolet…
A method of preventing or treating lost circulation during the drilling of a well comprises the addition, at concentration ranging between about 0.5 and 6 pounds per barrel, of water-dispersible fibers having a length between about 10 and 25 mm, for instance glass or polymer…
A fibre-reinforced, low density cement system for the control of lost circulation during the drilling of subterranean wells, generally comprising a cement particle mixture having a specific granulometric characterization and alkaline resistant fibres, such as fibres composed of…
Monitoring of a wellbore which penetrates a reservoir is carried out by providing tracer material at one or more subterranean locations within or proximate the wellbore, so that tracer may enter the flow and be present in flow from the wellbore; repeatedly taking samples from…
A method of lining tubing within a wellbore comprises applying a polymerisable fluid composition containing a photoinitiator to the interior surface of that tubing and initiating polymerisation of the composition by exposing it to actinic radiation, suitably light or ultraviolet…
When preparing a settable slurry such as a cement slurry for cementing an oil well, cement or other solid powder is mixed with water and a set retarder. In order to be able to run a convenient and rapid check on the concentration of retarder after dilution at the site of use, a…
A method of lining tubing within a wellbore comprises applying a polymerisable fluid composition containing a photoinitiator to the interior surface of that tubing and initiating polymerisation of the composition by exposing it to actinic radiation, suitably light or ultraviolet…
When preparing a settable slurry such as a cement slurry for cementing an oil well, cement or other solid powder is mixed with water and a set retarder. In order to be able to run a convenient and rapid check on the concentration of retarder after dilution at the site of use, a…
Monitoring of a wellbore which penetrates a reservoir is carried out by providing tracer material at one or more subterranean locations within or proximate the wellbore, so that tracer may enter the flow and be present in flow from the wellbore; repeatedly taking samples from…