A combined ceiling, air distribution system, mechanical chasse and structural roof member for a building is formed by a plurality of parallel inverted U-shaped structural modules 15 which are supported in a common horizontal plane. The flanges 17 of adjacent modules are spaced…
Urban Dev Corp
PROBLEM TO BE SOLVED: To obtain one united strength by forming a reinforcing bar cage with ring-shaped assembled members arranged by keeping predetermined intervals in the longitudinal direction and main reinforcement and hoops arranged at the outer periphery of the ring-shaped…
A ceramic key body (2) and an IC module (3) are provided. The key body has a head portion (2a) and an insert portion (2b) to insert into an electronic lock. The insert portion has a pit (4) formed therein, and the IC module is fitted into the pit. The IC module houses a…
<P>PROBLEM TO BE SOLVED: To provide a reinforcing technique of a slab without an influence such as restriction on a finish of the ceiling and restriction on an effective height of the ceiling by avoiding the placement of an outside cable downward of the slab in the case…
PROBLEM TO BE SOLVED: To provide a precast concrete plate, a concrete slab, and a building wherein when a concrete slab is built by a precast concrete plate having light type forms placed thereon, well balanced arrangement of reinforcing bars on a whole of the concrete slab is…
PROBLEM TO BE SOLVED: To arrange truss bars in response to the strength of a concrete slab by arranging the truss bars to a concrete board having a specified size at proper intervals and adjacently disposing a plurality of the truss bars to both side sections while parts of the…
PURPOSE: An artificial sculpture is provided to make various moods by varying temperature and color. CONSTITUTION: An artificial sculpture comprises a supporting board(100), a water tub(110) placed at the center part of the supporting board, a supporting member(120), and a…
A technique of making a maintenance program concerning a garbage disposal system by analyzing at least the weight of garbage brought in by users at least for one week while disposing of the garbage. Before garbage to be disposed of is inputted, the identification information on…
A technique of making a maintenance program concerning a garbage disposal system by analyzing at least the weight of garbage brought in by users at least for one week while disposing of the garbage. Before garbage to be disposed of is inputted, the identification information on…
The present invention provides a technique as follows: a maintenance program for a garbage disposal system is created by analyzing at least the weight of garbage of a user for at least one week while the garbage is disposed of. Before the garbage to be treated is put in,…
PROBLEM TO BE SOLVED: To improve strength by protruding part of a truss reinforcement fitted on a concrete board from one surface of the concrete board, and forming a light-weight mold at a part of the protruding surface. SOLUTION: A precast concrete board 1 is constructed by…
PROBLEM TO BE SOLVED: To provide a precast concrete board preventing a small beam for reinforcement formed around a step difference part from protruding on a lower face, a concrete slab, and a building. SOLUTION: A concrete board 2 having a predetermined size is provided with a…
PROBLEM TO BE SOLVED: To allow dirt to be hardly retained in the tubular body section of a drainage header. SOLUTION: This drainage header 8 is provided with a plurality of branch pipe junctions 14 on the side face of the tubular body 9, and the tubular body 9 is provided with…
<P>PROBLEM TO BE SOLVED: To provide a technique for scheduling a maintenance program for a garbage disposal system based on the analysis of at least a weight of a garbage brought into the system by a client for at least a week while carrying out the disposal of the…
PROBLEM TO BE SOLVED: To provide a floor slab capable of arranging bend bars of main directional bars in the upper end bars of the slab and a structure, in the floor slab constructed of precast concrete beams and forming a recess section by adjoining the precast concrete beams.…
Ce support de données, pouvant être utilisé pour une clé électronique, comprend un corps de clé (2) et un module IC (3). Le corps de clé est fait d'une partie formant tête (2a) et d'une partie d'insertion (2b) à introduire dans un verrou électronique. Cette partie…
<P>PROBLEM TO BE SOLVED: To provide a vibration isolation method and a vibration isolation structure capable of bearing pulling force with fluctuating axial force in the case of earthquake, further lengthening a periodic term of the vibration isolation structure and, at…
To provide a baseboard structure capable of solving problems regarding arrangement of furniture and devices, usability, etc., when a power receptacle is fixed, and improving the appearance of a baseboard part of a wall surface lower end.SOLUTION: A baseboard 4 comprises a…
PROBLEM TO BE SOLVED: To improve work efficiency by eliminating the reinforcement bending in a job site and facilitating construction in a job site in forming a stepped part in a concrete slab. SOLUTION: A concrete plate 2 of designated dimensions is divided into designated…
PROBLEM TO BE SOLVED: To provide a precast concrete plate, a concrete slab and a structures by which in forming a stepped part in a concrete slab, the reinforcement bending in a job site can be eliminated to improve work efficiency, and as a whole, well-balanced bar arrangement…
PROBLEM TO BE SOLVED: To provide precast concrete slab, concrete slab and structure capable of arranging balanced bars to two directions (vertical and horizontal directions) of long side direction and short side direction in the case the precast concrete slab arranging…
PROBLEM TO BE SOLVED: To secure a large space, and to improve natural lighting by constructing short size beams on the tip part upper surface of a balcony in a structure by laying plural thin PC plates between these short size beams by respectively installing long size beams in…
PROBLEM TO BE SOLVED: To increase the working efficiency by arbitrarily assembling two or more PC plates on which level difference parts are formed in corners, shorter sides, longer sides, or the like in one face of a rectangular concrete board in plan view, to form recesses.…
PROBLEM TO BE SOLVED: To provide a precast concrete board, in which a peripheral section has a strength enduring shear force working thereon and the load of the peripheral section flows in the two directions, and a concrete slab and a building. SOLUTION: In the thin PC board 1,…
PURPOSE: A distribution equipment for preventing water hammer and a piping system for water supply using the same is provided to quickly check the water leakage and effectively prevent the water hammer. CONSTITUTION: A distribution equipment for preventing water hammer comprises…