<P>PROBLEM TO BE SOLVED: To provide a restoring method of a global environment-friendly foundation structure, capable of flattening and reinforcing the foundation structure such as a floor and a slab of a building of causing settlement, a recess and a level difference and…
Upcon Kk
PROBLEM TO BE SOLVED: To provide a repair method of a tunnel by filling a cavity, capable of resuming stability of the tunnel to a state close to the completion of the tunnel not only by filling a cavity at the ceiling back side of a tunnel with hard urethane foam but also by…
PROBLEM TO BE SOLVED: To provide a method for improving soil, facilitating greening such as turfing, and to provide a greening method such as turfing.SOLUTION: This method for improving the soil includes forming a foam resin layer on a soil surface, and cultivating the soil…
PROBLEM TO BE SOLVED: To provide a construction management method capable of easily and surely confirming whether or not urethane foam is spread in the entire gap when filling the urethane foam in the gap generated at the upper part of an underground structure such as a…
<P>PROBLEM TO BE SOLVED: To provide a soil improvement method for improving a soil by controlling the shape of the resin expanded in the soil. <P>SOLUTION: This soil improvement method expands the expandable resin contained in a bag in the soil which requires…
PROBLEM TO BE SOLVED: To provide a method for correcting differential settlement of a continuous footing without causing damage such as cracking and breaking to the continuous footing and without requiring labor and cost for execution of work.SOLUTION: An expansible resin is…
PROBLEM TO BE SOLVED: To provide a method that achieves the seismic retrofitting of a hollow concrete utility pole without much effort or cost.SOLUTION: The method includes filling the hollow portion of a hollow concrete utility pole with an expansible resin to expand…
PROBLEM TO BE SOLVED: To provide a method for enabling a vehicular traffic hindrance, which is caused by a defect developed in a road surface by earthquakes and the like, to be temporarily eliminated without spending too much labor and time.SOLUTION: An expansible resin…
To provide a vivarium ornament capable of generating freely a size, a shape or a color, and immobilizing and cultivating live wood, vegetable or bulb.SOLUTION: Open cell polyurethane foam foamed by adding a coloring agent is used as a vivarium ornament.SELECTED DRAWING: Figure 1
To provide a method of repairing a settlement of a pad slab on which end portions of neighboring concrete slabs are mounted effectively in a short period of time.SOLUTION: An expansive resin is loaded below a pad slab and expanded.SELECTED DRAWING: Figure 2
To provide a reinforcement method for a utility pole by filling and expanding an urethane foam resin including a fiber reinforcement material into a hollow part of a hollow concrete utility pole without using a spray gun.SOLUTION: In a reinforcement method for a utility pole, an…
To provide a method for effectively dealing with road collapses caused by damages to underground sewer pipes using expansive resin.SOLUTION: When damages or cracks occur in the pipes, or gaps appear at the joints between the pipes, soil and sand from the surrounding area can…