PROBLEM TO BE SOLVED: To obtain a method and a system apparatus in which the corrosion state on the outer surface of a member constituting a structure such as a steel tower or the like can be detected automatically, in which the corrosion degree or the degradation level of a…
Tomoe Corp
PROBLEM TO BE SOLVED: To quantitatively and objectively evaluate the deterioration of coating such as the coating film defect and the corrosion of a coated steel product. SOLUTION: At the time of diagnosing the coating deterioration of a coated steel product 2, the steel product…
<P>PROBLEM TO BE SOLVED: To provide an erection method for a bridge girder, which enables the bridge girder to be jacked up by means of a simple jack device, and can shorten a construction period without the regulation of a juxtaposed general road. <P>SOLUTION: When…
PROBLEM TO BE SOLVED: To build an extremely large span frame by the use of an ordinary crane, reduce altitude works and temporary materials, shorten the construction period, decrease the cost, and improve safety. SOLUTION: The outer circumferential ring 3 and the outermost…
PROBLEM TO BE SOLVED: To enhance a deforming function in horizontal and vertical directions of a base isolating damper used in combination with a base isolating device for carrying out base isolating support of a structure such as a building and a bridge. SOLUTION: A steel pipe…
PROBLEM TO BE SOLVED: To always hold a detection head at the center position of a pipe by providing a guide part capable of being extended and contracted in the radius direction of the pipe and capable of coming into contact with the inner surface of the pipe under pressure to…
PROBLEM TO BE SOLVED: To provide a method and device for constructing a towerlike structure relatively unaffected by the influence of winds and reducing the rate of use of a crane. SOLUTION: A first block tower structure 1a is erected on a foundation part 10 and a first guide…
<P>PROBLEM TO BE SOLVED: To dissolve vertical warping deformation caused by applying horizontal deformation in a curved surface to a damper member curved in U-shape and constant in the width of the intermediate part, the consequent concentration of distortion on a specific…
<P>PROBLEM TO BE SOLVED: To provide a slewing gear of a lift-up device for building a tower structure excellent in application properties and safety and capable of safely building a rotary body such as large blades at an air position low from the ground even under a…
PURPOSE: To provide a method, which can efficiently construct and demolish a stud within a limited yard under the existing stud in the case of constructing and demolishing a stud and which can remarkably reduce the constructing cost and remarkably shorten the construction period…
PROBLEM TO BE SOLVED: To rapidly and easily reinforce a frame without works on an existing plane of structure, by fixing a reinforcing frame in a frame structure of a building by use of a steel wedge and arranging the earthquake-resistant wall in the plane of the reinforcing…
PROBLEM TO BE SOLVED: To provide a tension adjusting tool to prevent accidents such as broken cables stringed between steel towers or the steel towers from falling down. SOLUTION: The tension adjusting tool 1 reduces the sagging of the cables string between steel towers 40 and…
PURPOSE: To reduce the construction term and construction cost greatly and reduce work at an elevated place greatly when a bridge having high bridge pier is constructed. CONSTITUTION: After a bridge pier 2 is constructed by a jack-up construction method at an installation…
PROBLEM TO BE SOLVED: To simply correct the characteristic quantity of a color varied by various outdoor photographing conditions while always stably and accurately diagnosing a degree of deterioration when the degree of deterioration of the outer surface of a steel material of…
PROBLEM TO BE SOLVED: To evaluate a deterioration degree of a galvanized steel pipe inner face quantitatively and accurately when automatically detecting and determining interior corrosion of the steel pipe inner face by image analysis with a computer. SOLUTION: An industrial…
PURPOSE: To robotize and automate after-processing after field welding of a power transmission steel tower and the like to enable continuous work from welding to flame coating and painting treatment so as to simplify initial set-up of each after-processing process. CONSTITUTION:…
PROBLEM TO BE SOLVED: To provide a fixing structure of a pedestal which makes it possible to increase the adjusting precision for erection of the pedestal and reduces the construction period and does not require a particular process for shearing reinforcement. SOLUTION: A nearly…
PROBLEM TO BE SOLVED: To provide a laying method of a bridge floor plate which can contribute to the improvement of installation efficiency and safety, and a device.SOLUTION: A slide beam 11 which slides in an advance direction is arranged at a transportation bogie 12 traveling…
PURPOSE: To reduce lift-up weight and construct a building speedily by a compact and simple device in a lift-up construction method of a bridge pier and a steel tower. CONSTITUTION: After the construction of a basic part of a bridge pier and a steel tower is completed, a…
PURPOSE: To prevent a shielding room from penetration of any electromagnetic wave by sending electric energy in the shape of mechanical energy, and sifting out all the unnecessary electromagnetic waves in electric energy in the process of being reconverted into electric energy…
PROBLEM TO BE SOLVED: To certainly recover a blast material even in the case where it is difficult to adhere a closed part provided on a head end part of a blast nozzle on a surface of a material to be treated like backing treatment, etc., of a steel tower member at the time of…
PROBLEM TO BE SOLVED: To provide a bridge removal and construction method that helps reduce a construction period and lower cost by enabling use of a small capacity moving device such as a lifting device by making both bridges bear the other party's weight when removing the…
<P>PROBLEM TO BE SOLVED: To estimate the progress of the aged deterioration of a galvanized power transmission tower taking local characteristics into account by a method wherein a map information system is utilized and topographical conditions, environmental conditions,…
<P>PROBLEM TO BE SOLVED: To enable even periodic measurement of the shielding performance of an electromagnetic wave shielding room during its operation, besides measurement after its installation. <P>SOLUTION: This measuring device is constituted by respectively…
PROBLEM TO BE SOLVED: To surely detect/judge corroded parts without making a wrong detection so as to automate and save the labor to inspect the interior is steel pipes of horizontal/inclined members of a pylon, etc. SOLUTION: A CCD color camera 2 and a lamp 3 are set at a head…