<P>PROBLEM TO BE SOLVED: To provide a steel tower assembling/disassembling derrick which carries out quick assembly when a steel tower is set up, and achieves quick removal thereof, and to provide a method of removing the derrick. <P>SOLUTION: According to the…
Tlc Kk
PROBLEM TO BE SOLVED: To provide a surface treatment booth for a steel frame capable of ensuring a safe work environment for workers by preventing dust scattering in surface preparation or open blast, and avoiding environment contamination in surface treatment such as open…
<P>PROBLEM TO BE SOLVED: To provide an electric wire replacement method, which can efficiently relay an crossing wire which is in a hot-line state, by securing sufficient distance from the crossing wire to prevent interferences in the work, even if there is an electric…
PROBLEM TO BE SOLVED: To allow replacing of an insulator set while a spacer separating and holding respective power lines of a 4 conductor power line is being attached, and further, to allow replacement work with ease and at a high speed, with the number of components being…
<P>PROBLEM TO BE SOLVED: To provide a new rod-shaped body fall preventive device which prevents fall of a ground rod in any works relating to ground work and can simply adjust the length of a fall preventive wire body without getting the wire body entangled.…
<P>PROBLEM TO BE SOLVED: To easily raise and fall a boom without increasing a winding load when the boom is raised in the lifted state of a hoisted cargo. <P>SOLUTION: In this derrick, the boom having one end mounted to a mast vertically and temporarily fixed to an…
<P>PROBLEM TO BE SOLVED: To provide a fall preventing implement for a bolt, a nut, or the like making bolt head and nut locking work extremely easy and secure with simple structure by using a magnet for attracting with powerful magnetic force. <P>SOLUTION: The fall…
PROBLEM TO BE SOLVED: To provide a method for replacing the support bolt of an insulator string in a short time without removing the wires and without stopping power supply for a long time, while reducing the man-hours and expenses.SOLUTION: Two suspension yokes are fixed to the…
PROBLEM TO BE SOLVED: To provide a nozzle for a blasting device, which can uniform the surface roughness of a repairing part even when the repairing part is located in a place where the workability is bad, and to provide a surface treatment method.SOLUTION: The blasting device…
PROBLEM TO BE SOLVED: To provide a formation method of a laminated spray coating film that has a high adhesion strength, and consists of dissimilar metals in an arbitrary order and with arbitrary thickness, and can also improve working efficiency and reduce cost.SOLUTION: A…
PROBLEM TO BE SOLVED: To provide an arc-thermal spray which forms a stable low-temperature-thermally-sprayed film, even if the amount of thermal spraying is increased, to increasingly improve working efficiency.SOLUTION: In a parallel slitter-type arc-thermal-spray, cylindrical…
<P>PROBLEM TO BE SOLVED: To provide a technique for rewiring an electric wire, wherein when rewiring work for an electric wire is conducted by a hanging sheave method, a parent wire is supported at the central part of the front end edge of an insulator string yoke which…
<P>PROBLEM TO BE SOLVED: To provide an overhead wire wrapping apparatus with a simple and compact structure capable of preventing the drop of rust during replacing an earth wire and of reinforcing the earth wire by surely covering the existing overhead wire with a cover…
PROBLEM TO BE SOLVED: To prevent dust particulate of scrapings and open blasts from being scattered in a structure whose steel beam is exposed to the outside, to avoid an environmental pollution caused in a surface treatment such as open blasting, thermal spraying and paint…
PROBLEM TO BE SOLVED: To eliminate the need to secure a large site for fixing the base end of a branch line onto a ground, to surely support a stand bar by three branch lines, and to enable the tension management of the branch lines to be performed on the ground, in a stand bar…
<P>PROBLEM TO BE SOLVED: To provide a reel winder which has an ability of taking an electric wire up as well as just winding it on a reel. <P>SOLUTION: The reel winder includes a reel 4 supported rotatably, a driving device for driving the reel 4, and a traverser 11…
PROBLEM TO BE SOLVED: To provide a method for quickly and easily moving an existing electric cable having a large diameter without damaging the cable.SOLUTION: A method for moving an existing electric cable having a large diameter, comprises: measuring a real length including…
PROBLEM TO BE SOLVED: To provide a steel pipe which can obtain high rust prevention performance on an inner surface of the steel pipe, and can more surely extend a lifetime of the steel pipe.SOLUTION: A steel pipe 100 is structured so that an inner part thereof is filled with a…
PROBLEM TO BE SOLVED: To provide a coating booth and a coating method which prevent coating particles from scattering when coating to avoid environment pollution and to improve the working environment of a worker, and which enable the coating work to be completed in a short time…
PROBLEM TO BE SOLVED: To provide an arc spraying gun device which can perform spraying in such a manner that a sprayed coating thickness is made uniform even in a place inferior in workability.SOLUTION: The arc spraying gun device 100 melts metal wires 104a, 104b by arc…
PROBLEM TO BE SOLVED: To provide a method for preventing corrosion progress of a steel tower, which enables efficient treatment to be applied by simple operations to corrosion of an inner surface of a steel tube constituting the steel tower.SOLUTION: A method for preventing…
To provide a mounting metal tool for a base rod which is lighter than a conventional mounting metal tool, safer than a mounting metal tool mounted on the central part of a suspended rope, and easy to mount on a main column material.SOLUTION: A mounting metal tool is configured…
<P>PROBLEM TO BE SOLVED: To provide a method for vertically moving electric cables that moves an electric cable efficiently by preventing interference between the electric cable to be moved and crossing objects under the electric cable. <P>SOLUTION: The method for…
<P>PROBLEM TO BE SOLVED: To provide an apparatus for examining strength of a steel tower, which examines the strength of a tower body in each construction section in the assembling construction of the steel tower. <P>SOLUTION: This apparatus includes: a storage…
<P>PROBLEM TO BE SOLVED: To provide a fixing tool for safely and reliably fixing a fitted element to the painted surface of a steel structure such as a steel tower. <P>SOLUTION: This fixing tool A includes a magnet 3 attracted to the painted surface, a screw member 2…