Patents
US 8,527,248 B2#2049059 Most Cited · 32 citations2.5/yr · PR 4.57ActiveUS · Utility
System and method for performing an adaptive drilling operation

A system and method for performing an adaptive drilling operation is provided. The method involves obtaining data prior to drilling, constructing a base model with a base model unit from data obtained prior to drilling, constructing an overburden posterior model with an…

WO 2006/065915 A2#4781219 Most Cited · 18 citations0.9/yr · PR 4.57PendingWO · Application
Geometrical optimization of multi-well trajectories

A novel method is presented to automatically design a multi-well development plan given a set of previously interpreted subsurface targets. This method identifies the optimal plan by minimizing the total cost as a function of existing and required new platforms, the number of…

US 8,793,111 B2#7107742 Most Cited · 14 citations1.2/yr · PR 1.88ActiveUS · Utility
Automated field development planning

A system for automatically optimizing a Field Development Plan (FDP) for an oil or gas field uses a fast analytic reservoir simulator to dynamically model oil or gas production from the entire reservoir over time in an accurate and rapid manner. An objective function defining a…

WO 2008/150877 A1#26719051 Most Cited · 4 citations0.2/yr · PR 1.17PendingWO · Application
Automated field development planning of well and drainage locations

A hybrid evolutionary algorithm ('HEA') technique is described for automatically calculating well and drainage locations in a field. The technique includes planning a set of wells on a static reservoir model using an automated well planner tool that designs realistic…

WO 2011/091368 A2#40423410 Most Cited · 2 citations0.1/yr · PR 1.00PendingWO · Application
System and method for performing an adaptive drilling operation

A system and method for performing an adaptive drilling operation is provided. The method involves obtaining data prior to drilling, constructing a base model with a base model unit from data obtained prior to drilling, constructing an overburden posterior model with an…

WO 2006/065915 A3#69705905 Most Cited · 0 citations0.0/yr · PR 0.56ExpiredWO · Utility
Geometrical optimization of multi-well trajectories

A novel method is presented to automatically design a multi-well development plan given a set of previously interpreted subsurface targets. This method identifies the optimal plan by minimizing the total cost as a function of existing and required new platforms, the number of…

WO 2011/091368 A3#116728617 Most Cited · 0 citations0.0/yr · PR 0.56ActiveWO · Utility
System and method for performing an adaptive drilling operation

A system and method for performing an adaptive drilling operation is provided. The method involves obtaining data prior to drilling, constructing a base model with a base model unit from data obtained prior to drilling, constructing an overburden posterior model with an…