<P>PROBLEM TO BE SOLVED: To eliminate assembling works of hoops in a bridge pier construction field to improve workability of the bridge pier construction. <P>SOLUTION: In a precast block 1A, intermediate hoops 3, 4 are arranged at every specified distance in…
Teihyu Corp
<P>PROBLEM TO BE SOLVED: To provide a segment comprising a functional structure capable of easily and uniformly performing the lining of segment edge parts after joining connection. <P>SOLUTION: In this secondary lining saving-type segment for constructing a shield…
<P>PROBLEM TO BE SOLVED: To provide an acid resistant concrete having an increased bending strength. <P>SOLUTION: (g) Fiber is mixed to the acid resistant concrete containing (a) 10-85 wt.% fused slag powder whose CaO/SiO<SB>2</SB>molar ratio is…
PROBLEM TO BE SOLVED: To provide a method for manufacturing a steel segment by which the internal face of the segment can be neatly finished without depending upon manual finishing and the finish accuracy of a corner part and a block drawing part is high and further, the…
PROBLEM TO BE SOLVED: To obtain a box culvert by forming the inside surface and/or the outside surface from a material containing waste molten slag and comprising a slag composition of a specific CaO/SiO2 ratio, an alkali silicate and an aggregate to effectively utilize the…
<P>PROBLEM TO BE SOLVED: To provide a manufacturing method to obtain the product with high perfection regarding a segment obtained by filling concrete into a box type steel shell, covering the surface with a resin sheet and providing a space for a linking member free of…
PROBLEM TO BE SOLVED: To provide a acidproof concrete having an improved productivity without a cost-up, along with improving a fluidity of the fresh concrete, by suppressing the change in slump properties with the lapse of time and lengthening the workable time. SOLUTION: This…
<P>PROBLEM TO BE SOLVED: To provide a joint structure for a pipe and an earthquake resistant joint method for an existing pipe capable of easily resisting the existing pipe having a caliber difficult to perform work from the inside of a manhole against an earthquake and,…
<P>PROBLEM TO BE SOLVED: To prevent a concrete component from leaking out of a joint part when placing concrete. <P>SOLUTION: A lining sheet 1 has a plate 2 for covering the surface of a concrete structure, a rib 3 embedded in the concrete, the joint part 5 formed so…
<P>PROBLEM TO BE SOLVED: To provide an earthquake resisting construction method and an earthquake resisting structure facilitating repair work with a rigid structure connection part left as it is regardless of the pipe bore of an existing water flow pipeline.…
PROBLEM TO BE SOLVED: To provide a Hume pipe superior in the acidproof property while effectively utilizing various wastes by using a material comprising a slug composition including the waste molten slug and having a specific CaO/SiO2 mol ratio, alkali silicate used in an…
<P>PROBLEM TO BE SOLVED: To make it possible to repair a manhole wall and an invert while minimizing the broken quantity and expect stable earthquake-resisting construction. <P>SOLUTION: Only a tube body 2 connected to the peripheral wall of a manhole is cut off at a…
PROBLEM TO BE SOLVED: To provide a leading pipe enabling long-distance execution in a pipe jacking method for burying a pipe body in the ground. SOLUTION: In the pipe jacking method, the leading pipe A disposed for connection to the front end of a Hume pipe following an…
PROBLEM TO BE SOLVED: To provide an acid resistant concrete which is low in viscosity of fresh concrete, has excellent formability and appearance, and in which higher strength is obtained by a short time atmospheric-pressure steam curing to thereby improve productivity.…
PROBLEM TO BE SOLVED: To prevent expansion of a lining material for preventing corrosion in base material concrete in spite of penetration of a corrosive liquid into a anticorrosive sheet if a joint and the like of the anticorrosive sheet is cracked or peeled off in a corrosive…
PROBLEM TO BE SOLVED: To realize the reduction of a burden on an operator in a hole-filling operation and a cost, the shortening of the term of works or the like. SOLUTION: The holding structure of fillers 3 in which a holding material 5 anchoring and holding the fillers 3 in a…
<P>PROBLEM TO BE SOLVED: To provide a flexible coupling, with which a work of modifying the connection between an existing manhole and a pipe into an earthquake resistant structure can be completed inside the manhole. <P>SOLUTION: The flexible coupling (a) is fitted…
<P>PROBLEM TO BE SOLVED: To provide a construction method which can be performed without reference to a diameter of a pipeline, facilitates the formation of a space in a concrete wall surface, and enables the inexpensive execution of work. <P>SOLUTION: A wall surface…
<P>PROBLEM TO BE SOLVED: To provide a joint structure in which bending performance of a joint can be held either in being buried in the ground or in being covered by lining concrete. <P>SOLUTION: This joint structure is for connecting the pipes to each other while…
PROBLEM TO BE SOLVED: To provide a method for accurately and cleanly finishing a concrete placing face. SOLUTION: A concrete a is fed into a form 1 with a specified shape and before the concrete a is cured, a lid body 2 whose inner face is cleanly finished and provided with an…
PROBLEM TO BE SOLVED: To obtain a manhole by forming the inside surface and/or the outside surface from a material containing waste molten slag and comprising a slag composition of a specific CaO/SiO2 ratio, an alkali silicate and an aggregate to effectively utilize the waste…
PROBLEM TO BE SOLVED: To provide an earthquake resisting joint structure coping with bending variation and horizontal movement along the axis of a conduit. SOLUTION: In this joint structure, the end part of a pipe 3 is inserted in a drilled hole 2 opened in the peripheral wall…
<P>PROBLEM TO BE SOLVED: To provide an earthquake-resistant flexible joint for directly connecting a pipe as a connection object to a connecting hole of a manhole by exerting an excellent shock absorbing function without making a manhole diameter larger. <P>SOLUTION:…
<P>PROBLEM TO BE SOLVED: To provide a removal pipe removable from the installed position of a manhole at an intermediate part of a pipeline without causing the deterioration of a working environment by axially dividing the pipe at least in three parts by partial cutting or…
<P>PROBLEM TO BE SOLVED: To provide a new built-up manhole which is suitably provided in hot spring resorts or the like by preventing corrosion due to toxic components such as acidic waste water, a sulfur component, sulfurous acid gas or the like. <P>SOLUTION: A pipe…