PURPOSE: A membrane bio reactor(MBR)-based wastewater treating apparatus is provided to minimize dissolved oxygen and nitrate nitrogen in sludge which is transferring to an anaerobic bath. CONSTITUTION: An MBR-based wastewater treating apparatus, an anaerobic bath(100), a first…
Ssangyoung Engineering & Construction
PURPOSE: A method for constructing a retaining wall for a large underground structure through the tension of earth anchors is provided to secure a wide underground work-space without using support beams. CONSTITUTION: A method for constructing a retaining wall for a large…
PURPOSE: A waste transferring pipe having a polyurethane coating layer and a forming method of the coating layer thereof are provided to prevent the abrasion, corrosion and shock of a pipe by garbage using polyurethane coating layer. CONSTITUTION: A forming method of a…
The present invention relates to a top-down construction method which directly withstands earth pressure by means of an underground part (beam, slab) of a building while excavating, to construct the underground part of the building. More particularly, the present invention…
PURPOSE: A sealing structure of a wall steel pipe joint and a sealing method using the same are provided to seal the joint between steel pipes by injecting a grout material into the gap between first and second connectors. CONSTITUTION: A sealing structure(100) of a wall steel…
PURPOSE: An apparatus for connecting the center of a strut is provided to improve the buckling performance of the strut by an inner plate. CONSTITUTION: An apparatus(100) for connecting the center of a strut comprises a center connection portion(20). Both ends of the center…
PURPOSE: A one-body type heat-insulating board is provided to ensure excellent thermal insulation, sound absorption, and strength and moisture resistance by forming an inorganic binder layer on a polyester fiber sheet. CONSTITUTION: An inorganic binder composition comprises…
PURPOSE: An apparatus for pulling a stringing of a suspension insulator device and a stringing working process using the same are provided to reduce the time and costs of a stringing work by excluding a winch and a winch transfer vehicle. CONSTITUTION: A wire pulling device(300)…
PURPOSE: A construction method for a micro pile and a pile assembly for the same method are provided to enable a grouting work to be smoothly performed and to ensure sufficient strength since an out casing is not buried, a pack is pressed and expanded, and thus the ground is…
The present invention relates to a top-down construction method which directly withstands earth pressure by means of an underground part (beam, slab) of a building while excavating, to construct the underground part of the building. More particularly, the present invention…
PURPOSE: A vertical post tension structure of a slope structure and a construction method thereof are provided to ensure structural stability in a construction process or in any process after completion by expanding the concept of conventional post tension to a vertical member,…
PURPOSE: An apparatus for connecting the end of a strut is provided to improve the buckling and compression performance of the strut as axial force is uniformly spread on the end of a steel pipe. CONSTITUTION: An apparatus for connecting the end of a strut comprises an end…