US 2011307087 A1#17959693 Most Cited · 6 citations0.4/yr · PR 1.56PendingUS · Application
Systems and methods of rescheduling manufacturing releases

Techniques are presented for rescheduling manufacturing releases. A plurality of release information elements are identified based on a first run of a first advanced planning system. The release information elements comprise dates of planned manufacturing release and quantity.…

US 8,645,177 B2#17377734 Most Cited · 6 citations0.5/yr · PR 1.74ActiveUS · Utility
Single step flight schedule optimization
Inventors: Pachon Julian, Smith Stuart HAssignee: Pachon Julian, Smith Stuart HFiled 2008-10-01 · Granted 2014-02-04

The subject matter of this specification can be embodied in, among other things, a method that includes generating a first graph including possible flight segments between airline stations for an airline and determining a set of permissible crew pairings based on a traversal of…

US 2008033586 A1#25271591 Most Cited · 4 citations0.2/yr · PR 1.32PendingUS · Application
Planning production for complementary demands

Method, system and program product for planning production for complementary demands are disclosed. In one embodiment, a method includes obtaining complementary demand values including at least one daily going rate (DGR) demand and a service demand; running a first planning…

US 8,140,372 B2#32828713 Most Cited · 3 citations0.2/yr · PR 1.08ActiveUS · Utility
Planning production for complementary demands
Inventors: Chang Chih-hui, Denton Brian T, Hegde Sanjay R, Milne Robert J, Smith Stuart HAssignee: Chang Chih-hui, Denton Brian TFiled 2006-08-03 · Granted 2012-03-20

Method, system and program product for planning production for complementary demands are disclosed. In one embodiment, a method includes obtaining complementary demand values including at least one daily going rate (DGR) demand and a service demand; running a first planning…

US 8,452,637 B2#85145403 Most Cited · 0 citations0.0/yr · PR 0.56ActiveUS · Utility
Systems and methods of adjusting the order of product manufacturing and rescheduling release dates
Inventors: Degbotse Alfred T, Milne Robert J, Smith Stuart H, Ward Jacqueline NAssignee: Degbotse Alfred T, Milne Robert JFiled 2010-06-09 · Granted 2013-05-28

Techniques are presented for rescheduling manufacturing releases. A plurality of release information elements are identified based on a first run of a first advanced planning system. The release information elements comprise dates of planned manufacturing release and quantity.…