Patents
Assignee / Organization

Sinotech Engineering Consultants Ltd

0Total Forward Citations
19Indexed Patents
0Avg Citations / Patent
0Portfolio H-Index
TW 201,113,413 A#95972243 Most Cited · 0 citations0.0/yr · PR 0.56ActiveTW · Utility
Clamp apparatus for foreign object in a well

A clamp apparatus for a foreign object in a well mainly comprises an air compressor, a clamp device and a control box. The interior of clamp device is installed with a small pneumatic cylinder and claws. The apparatus enables the clamp device to enter a well, and after arriving…

TW 202,225,532 A#89875020 Most Cited · 0 citations0.0/yr · PR 0.56ActiveTW · Utility
Reinforced concrete coupling beam confined by discontinuous steel plates

The reinforced concrete coupling beam structure includes a few longitudinal reinforcement, several sets of transverse reinforcement, concrete, a first web side steel plate, a second web side steel plate. The longitudinal reinforcements are placed along the first direction. The…

TW 202,301,168 A#74113902 Most Cited · 0 citations0.0/yr · PR 0.56ActiveTW · Utility
The method and the system of engineering automation design and management

The present invention provides the method including a first step, a second step and a third step. Set up a standardization form, generate a stereogram by a modeling program, and transfer the stereogram to plans. The system includes a management platform, a standardization form,…

TW 202,301,170 A#72548998 Most Cited · 0 citations0.0/yr · PR 0.56ActiveTW · Utility
The method of the pipeline project design

The present invention provides the method including a first step, a second step, a third step and a fourth step. Fill in parameters in a standardization form, import the standardization form to a working platform, generate a stereogram by transferring the standardization form by…

TW 202,301,174 A#68695387 Most Cited · 0 citations0.0/yr · PR 0.56ActiveTW · Utility
The modeling method of csd and sem

The present invention provides the method includes a first step, a conflict checking, a third step, a fourth step, a fifth step and a sixth step. Setting up a modeling standard, executing the conflict checking, and the SEM is completed. According to a standardized form of…

TW 202,303,429 A#122234335 Most Cited · 0 citations0.0/yr · PR 0.56ActiveTW · Utility
Automatic analysis and verification of deep excavation engineering and system thereof

An analysis and verification for deep excavation engineering, which is implemented on the management platform. First, enter the parameter information and construction plan required for analysis and verification. Then, perform a stability check based on the parameter information.…

TW 202,303,430 A#131596048 Most Cited · 0 citations0.0/yr · PR 0.56ActiveTW · Utility
Automatic analysis method of shield tunnel engineering and system thereof

An automated analysis method of shield tunnel engineering is implemented on the management platform. First, input vehicle information and track geometric parameters, and generate envelope information based on the vehicle information and track geometric parameters. Then, the…

TW 202,303,530 A#137317662 Most Cited · 0 citations0.0/yr · PR 0.56ActiveTW · Utility
Automatic escape route generation method and system thereof

An automatic escape route generation method is applied in the environment of a three-dimensional model building module. The three-dimensional model building module is used to convert a plan view of a building into a three-dimensional model. First, provide building information…

TW 202,433,324 A#154267900 Most Cited · 0 citations0.0/yr · PR 0.56ActiveTW · Utility
Configuration method for station space capable of generating a 3D model from a building element database

A configuration method for station space is disclosed, which comprises: loading the quantity of station facility and space requirement value from a space configuration program, wherein the space configuration program inputs station space geometric conditions and vertical flow…

TW 202,433,325 A#93934917 Most Cited · 0 citations0.0/yr · PR 0.56ActiveTW · Utility
Station building design system and method which can accelerate a generation of basic station 3D models to assist collaborative work, and can also save manpower and time in the later stages of design verification, avoid uncertainties in manual review, improve design efficiency, and maintain design quality

Disclosed is a station building design system and includes a design platform and a terminal device. The design platform has a calculation program, and the terminal device has a space configuration program, a modeling program, and a verification program. The terminal device is…

TW 202,433,335 A#143475127 Most Cited · 0 citations0.0/yr · PR 0.56ActiveTW · Utility
Semantic analysis system and method comprising a database, an identification unit, a comparison unit, and a processing unit

The present invention provides a semantic analysis system, comprising a database, an identification unit, a comparison unit, and a processing unit, wherein the database collects a plurality of document data and a plurality of keywords related to the plural document data; the…

TW 202,433,388 A#100859430 Most Cited · 0 citations0.0/yr · PR 0.56ActiveTW · Utility
Shield tunneling construction information platform including a storage module, a transmission module and a processing module, wherein the processing module retrieves the design information and the geodetic monitoring data of the shield tunnel through the Internet, performs settlement feedback analysis based on the design information, the geodetic monitoring data and the excavation data of the shield tunnel, and generates surface settlement information

The present invention relates to a shield tunneling construction information platform which includes: a storage module, a transmission module and a processing module. The storage module stores an engineering file of the shield tunnel. The engineering file of the shield tunnel is…

TW 202,433,419 A#97422975 Most Cited · 0 citations0.0/yr · PR 0.56ActiveTW · Utility
Dynamic traffic adjustment method during construction including image collection and image recognition, establishment of a virtual field, and dynamic adjustment

The invention relates to a dynamic traffic adjustment method during construction, which includes image collection and image recognition, establishment of a virtual field, and dynamic adjustment. The image collection and image recognition use a processing unit to analyze and…

TW 202,443,428 A#82282455 Most Cited · 0 citations0.0/yr · PR 0.56ActiveTW · Utility
Three-dimensional element generation system and method thereof comprising an acquisition module, a processing module, and a three-dimensional generation module to quickly generate three-dimensional maps, which facilitate finding collision points in the underground pipeline systems

The present invention relates to a three-dimensional element generation system, comprising: an acquisition module that receives a plurality of loaded elements; a processing module that confirms two-dimensional information corresponding to a preset position based on a…

TW 202,443,429 A#83724964 Most Cited · 0 citations0.0/yr · PR 0.56ActiveTW · Utility
3D component collision adjustment system and method enables quick identification of collision points between 3D components and applies the relevant avoidance rules to adjust the points of collision, effectively achieving the elimination of collision points

The present invention relates to a 3D component collision adjustment system, which utilizes a selection module to select a first 3D component from a 3D diagram. A checking module then executes a collision checking procedure to confirm whether there is at least one overlapping…

TW 202,511,999 A#64680816 Most Cited · 0 citations0.0/yr · PR 0.56ActiveTW · Utility
Drainage object association system and method solving the difficulty of extracting road information and the problem of spending considerable time on design modifications when changing drainage object designs

The present invention relates to a drainage object association system, comprising: a creation module for creating a drainage object; a detection module, connected to the creation module to detect the drainage object, wherein the detection module detects the drainage object…

TW 202,512,001 A#149093515 Most Cited · 0 citations0.0/yr · PR 0.56ActiveTW · Utility
Elevation correction system and method for drainage system comprising a confirmation module, a judgment module, and a correction module

The present invention relates to an elevation correction system for a drainage system, comprising: a confirmation module, which is configured to allow a user to select information to be modified through an interface and to confirm whether the selected information to be modified…

TW 202,522,407 A#131059850 Most Cited · 0 citations0.0/yr · PR 0.56ActiveTW · Utility
Feature identification method based on artificial intelligence including the following steps: data inputting, data preprocessing, data set segmentation, training model evaluation, hyperparameter adjustment, model determination and image recognition

A method for identifying features based on artificial intelligence includes: data inputting for inputting a first map and a second map; data preprocessing for converting the second map into an input format usable by a machine learning model; data set segmentation for randomly…

TW 202,522,409 A#98407428 Most Cited · 0 citations0.0/yr · PR 0.56ActiveTW · Utility
Method and system for identifying land object to use AI model for identifying the satellite images and extract the surface environmental information

A method and system for identifying a land object. The method includes: obtaining a satellite image data and plane coordinate information of a land object; generating a label data of the land object; training an artificial intelligence recognition model of the land object; and…