Patents
Assignee / Organization

Sims J. Robert

68Total Forward Citations
5Indexed Patents
14Avg Citations / Patent
4Portfolio H-Index
US 2001002488 A1#1878404 Most Cited · 34 citations1.4/yr · PR 3.32PendingUS · Application
Systems and methods to perform defect management to block addressable storage media
Inventors: Sims J Robert, Way KyleAssignee: Sims J. Robert, Kyle WayFiled 2001-01-02

The present invention discloses a method and system for providing defect management of a bulk data storage media wherein logical addresses of media data blocks are continuously slipped to omit all media data blocks determined to be defective at the time of an initial media…

US 2013060536 A1#4730813 Most Cited · 18 citations1.4/yr · PR 6.60PendingUS · Application
Engineered methodology for design verification and validation of ultra-deep high pressure high temperature oil and gas well control equipment

A process for the verification and validation testing of equipment and components for drilling, completion, production and general well construction (typically such as subsurface safety valves, wellhead trees, blowout preventers and wireline pressure control equipment) to…

US 2004078648 A1#12547786 Most Cited · 8 citations0.4/yr · PR 2.94PendingUS · Application
Systems and methods to perform defect management to block addressable storage media
Inventors: Sims J Robert, Way KyleAssignee: Sims J. Robert, Kyle WayFiled 2003-03-14

The present invention discloses a method and system for providing defect management of a bulk data storage media wherein logical addresses of media data blocks are continuously slipped to omit all media data blocks determined to be defective at the time of an initial media…

WO 2013/032773 A1#15520065 Most Cited · 7 citations0.5/yr · PR 1.65PendingWO · Application
Engineered methodology for design verification and validation of ultra-deep high pressure high temperature oil and gas well control equipment

A process for the verification and validation testing of equipment and components for drilling, completion, production and general well construction (typically such as subsurface safety valves, wellhead trees, blowout preventers and wireline pressure control equipment) to…

US 8,688,418 B2#47938503 Most Cited · 1 citations0.1/yr · PR 0.95ActiveUS · Utility
Engineered methodology for design verification and validation of ultra-deep high pressure high temperature oil and gas well control equipment

A process for the verification and validation testing of equipment and components for drilling, completion, production and general well construction (typically such as subsurface safety valves, wellhead trees, blowout preventers and wireline pressure control equipment) to…