Patents
Assignee / Organization

Sand Guido

51Total Forward Citations
8Indexed Patents
6Avg Citations / Patent
3Portfolio H-Index
WO 2013/026731 A1#1726577 Most Cited · 35 citations2.7/yr · PR 9.78PendingWO · Application
System and method to optimize operation of a water network
Inventors: Blank Frederik, Sand Guido, Lenz RalfAssignee: Abb Technology Ag, Blank FrederikFiled 2012-08-13

A system for optimizing operation of a water network comprises at least one data storage unit (23) for storing a hydraulic model as well as at least one operational constraint of the water network (17), where the hydraulic model represents the dependence of heads and flows in…

WO 2011/066856 A1#11937494 Most Cited · 9 citations0.6/yr · PR 1.83PendingWO · Application
A method, apparatus, computer program and computer program product for controlling a crane set

It presented a method for controlling a crane set of at least two automated container cranes. The method comprises the steps of : determining that a delayed completion time of a movement operation of a first crane of the crane set allows the completion time of an overall plan of…

WO 2013/041440 A1#24088186 Most Cited · 4 citations0.3/yr · PR 1.49PendingWO · Application
System and method for plant wide asset management

A system for plant wide asset management of a large scale production plant (20) comprises a processing unit (PU) for generating output data (0_1, 0_2) from input data (I_1, I_2), a data source unit (DS, A/D) for providing the input data (I_1, l_2) based on at least one signal…

WO 2012/048808 A1#29350719 Most Cited · 3 citations0.2/yr · PR 1.32PendingWO · Application
Method and device for optimising a production process

The invention relates to a method for determining an optimal production schedule (PAP opt ), comprising the following steps: - generating a first production schedule (PAP1) according to a predetermined first cost function (KF1) and a predetermined production process model (M),…

WO 2011/107268 A1#132445741 Most Cited · 0 citations0.0/yr · PR 0.56PendingWO · Application
Method and device for co-ordinating two consecutive production stages of a production process
Inventors: Sand Guido, Xu Chaojun, Harjunkoski Liro, Saliba SlemanAssignee: Abb Ag, Sand GuidoFiled 2011-03-02

The invention relates to a method for co-ordinating two consecutive productions stages (11, 13) of a production process. The method comprises the following steps: a) preparing (S1) a production schedule of a first of the production stages (11) according to a first optimisation…

WO 2011/107268 A8#107433726 Most Cited · 0 citations0.0/yr · PR 0.56ActiveWO · Utility
Method and device for co-ordinating two consecutive production stages of a production process
Inventors: Sand Guido, Xu Chaojun, Harjunkoski Iiro, Saliba SlemanAssignee: Abb Ag, Sand GuidoFiled 2011-03-02

The invention relates to a method for co-ordinating two consecutive productions stages (11, 13) of a production process. The method comprises the following steps: a) preparing (S1) a production schedule of a first of the production stages (11) according to a first optimisation…

WO 2012/010271 A1#97661980 Most Cited · 0 citations0.0/yr · PR 0.56PendingWO · Application
Method and device for coordinating two consecutive production steps of a production process
Inventors: Sand Guido, Xu Chaojun, Harjunkoski Iiro, Saliba SlemanAssignee: Abb Ag, Sand GuidoFiled 2011-07-13

The invention relates to a method for coordinating two consecutive production steps (11, 13) of a production process. The method comprises the following steps: a) creating (S1) a production flow chart of a first of the production steps (11) according to a first optimization goal…

WO 2013/091673 A1#141731242 Most Cited · 0 citations0.0/yr · PR 0.56PendingWO · Application
Systems and methods for optimized operation of an industrial production or manufacturing facility

A production planning system (1) and a system for energy supply planning (4) are arranged to determine a production schedule and an energy supply schedule, respectively, by interactively and mutually exchanging scheduling information with the respective other system and by…