Patents
Assignee / Organization

Richard Amy

63Total Forward Citations
5Indexed Patents
13Avg Citations / Patent
4Portfolio H-Index
US 2005203593 A1#1779473 Most Cited · 35 citations1.7/yr · PR 4.00PendingUS · Application
Method for dermatology therapies in combination with low level laser treatments

The present invention is a method for promoting faster wound healing and alleviating pain during and after various dermatology-related treatments. The method comprises using low level laser therapy in conjunction with dermatological treatments including intense pulsed light,…

US 8,219,505 B2#9691689 Most Cited · 11 citations0.8/yr · PR 1.52ActiveUS · Utility
Energy usage prediction and control system and method
Inventors: Richard Amy, Kelly-detwiler Peter, Franz JosephAssignee: Richard Amy, Kelly-detwiler PeterFiled 2007-08-15 · Granted 2012-07-10

A controller and/or a gateway acts as a feedback-based energy estimator for controlling initial and refined estimates of energy usage of one or more buildings controlled by the controller or gateway. An initial estimate of a building's energy needs for a specified time in…

WO 2009/023230 A1#11787674 Most Cited · 9 citations0.5/yr · PR 1.96PendingWO · Application
Multi-building control for demand response power usage control

An energy usage coordinator controls the energy usage of individual buildings of a group (or portfolio) of buildings in one or more load zones These buildings have all contracted with an energy company which controls (directly or indirectly) the energy usage coordinator By…

WO 2009/023231 A1#16049967 Most Cited · 7 citations0.4/yr · PR 1.38PendingWO · Application
Energy usage prediction and control system and method

A controller is a feedback-based energy estimator for controlling initial and refined estimates of energy usage of one/several buildings controlled thereby. An initial estimate of a building's energy needs for a specified future time (e.g., a month or a week ahead) are…

WO 2009/023229 A1#49182081 Most Cited · 1 citations0.1/yr · PR 0.89PendingWO · Application
Multiple input building controller

Controllers associated with the high energy devices may are programmed or configured with processing rules by a building manager or an energy usage coordinator such that the controllers can respond to various changing conditions without having to be contacted by the energy usage…