Patents
Assignee / Organization

Rees Hugh

64Total Forward Citations
11Indexed Patents
6Avg Citations / Patent
4Portfolio H-Index
WO 2011/025471 A1#3961552 Most Cited · 21 citations1.4/yr · PR 3.23PendingWO · Application
Automated hydrocarbon reservoir pressure estimation

A method and system for estimating reservoir pressure in a hydrocarbon reservoir from downhole pressure measurements of producing wells is disclosed. Pressure measurements are obtained from wells in the production field over time, and communicated to a server that applies the…

US 8,131,470 B2#5311401 Most Cited · 17 citations1.2/yr · PR 3.04ActiveUS · Utility
Managing flow testing and the results thereof for hydrocarbon wells
Inventors: Yusti German, Rees Hugh, Webster Michael J, Foot JohnAssignee: Yusti German, Rees HughFiled 2009-10-05 · Granted 2012-03-06

Automated monitoring and management of well tests of hydrocarbon wells in a production field. Routing of the output of a well to a flow meter, separated from the output from other wells in the field, is detected by a computer system such as a server. Measurement data including…

WO 2011/042448 A2#9242188 Most Cited · 11 citations0.7/yr · PR 2.36PendingWO · Application
Managing flow testing and the results thereof for hydrocarbon wells

Automated monitoring and management of well tests of hydrocarbon wells in a production field. Routing of the output of a well to a flow meter, separated from the output from other wells in the field is detected by a computer system such as a server (8). Measurement data…

US 8,898,017 B2#26268697 Most Cited · 4 citations0.3/yr · PR 1.22ActiveUS · Utility
Automated hydrocarbon reservoir pressure estimation
Inventors: Kragas Tor Kristian, Foot John, Rees Hugh RichardAssignee: Kragas Tor Kristian, Foot JohnFiled 2009-05-05 · Granted 2014-11-25

A method and system for estimating reservoir pressure in a hydrocarbon reservoir from downhole pressure measurements of producing wells is disclosed. Pressure measurements are obtained from wells in the production field over time, and communicated to a server that applies the…

GB 331,604 A#34597979 Most Cited · 2 citations0.0/yr · PR 1.67ExpiredGB · Utility
Improvements in fitting pumps into deep well piping
Inventors: Assignee: John Abel Yerkes, Rees Hugh LemmonFiled 1929-04-15

331,604. Yerkes, J. A., and Lemmon, R. H. April 15, 1929. Mountings.-The tube lining in a deep well is provided with a partly conical shoe 7 on which is lowered the coned seat 16 of a pump until recesses 22 in the pump barrel extension are engaged by projections 26 of spring…

WO 2011/042448 A3#122212571 Most Cited · 0 citations0.0/yr · PR 0.56ActiveWO · Utility
Managing flow testing and the results thereof for hydrocarbon wells

Automated monitoring and management of well tests of hydrocarbon wells in a production field. Routing of the output of a well to a flow meter, separated from the output from other wells in the field is detected by a computer system such as a server (8). Measurement data…