A method for constructing a reinforced concrete bridge deck supported on longitudinal steel beams (1) comprises placing the beams then sliding precast concrete slab units (4,5) on them and pouring concrete in the gap between. Vertical steel starter bars (13), in rows of three,…
Razel
A mobile apparatus which, at a front portion, removes the asphalt top surface and the underlayer of a road and crushes the removed materials to reutilize the crushed materials for redistribution of the crushed material along the road surface at the rear of the mobile apparatus.…
Method for increasing the length of a span of a bridge formed by a deck (1) supported by abutments (4) and piers (2, 3), by removing at least one pier (2). According to this method, the following operations are carried out: a) construction of a tower (10) having an upper part…
L'invention concerne une machine mobile destinée à traiter la sous-couche par exemple d'une route et à concasser les matériaux obtenus pour les réutiliser. La machine comporte un châssis (1) avec un ensemble de propulsion automoteur. Le châssis (1) porte une pelle (11)…
1. A process for renovating roadways generally comprising a foundation layer, a base course and a pavement, according to which the old roadway is regenerated by a treatment which comprises removal of the existing roadway, collection and screening of the material removed, and…
The invention relates to a shuttering method and system for producing a bridge. According to this method, a slab (3) is prefabricated in at least one section on a shuttering area (A). For each girder (2) of the bridge (1), a downwardly open longitudinal cavity (10) is formed in…
A method for widening the concrete deck of an existing bridge consists of placing a precast prestressed or reinforced concrete beam (8) longitudinally under the deck, with precast reinforced concrete slabs (14) simply supported by the beam (8) and angle brackets (16), fixed to…
Method for increasing the length of a span of a bridge formed by a deck (1) supported by abutments (4) and piers (2, 3), by removing at least one pier (2). According to this method, the following operations are carried out: a) construction of a tower (10) having an upper part…
L'INVENTION CONCERNE UNE MACHINE MOBILE DESTINEE A TRAITER LA SOUS-COUCHE PAR EXEMPLE D'UNE ROUTE ET A CONCASSER LES MATERIAUX OBTENUS POUR LES REUTILISER. LA MACHINE COMPORTE UN CHASSIS 1 AVEC UN ENSEMBLE DE PROPULSION AUTOMOTEUR. LE CHASSIS 1 PORTE UNE PELLE 11…
The self-loading bucket comprises, on either side of the lower end of the conveyor 2, a substantially U-shaped self-loading element 4 provided at its lower end in extension of the base of the U with a front leading blade 5, this self-loading element 4 being firmly attached to…
Method for increasing the length of a span of a bridge formed by a deck (1) supported by abutments (4) and piers (2, 3), by removing at least one pier (2). According to this method, the following operations are carried out: a) construction of a tower (10) having an upper part…
A support deviator beam (6) is placed on the central part of the beam face opposite to the load carrying face. A pre-stressed cable (3) is placed to connect the two ends of the beam. The cable is put under a tension applicable to the load which the beam will carry. In each of…
Cet ensemble d'âme continue (A) pour ouvrage d'art à ossature mixte est remarquable en ce qu'il comprend, en alternance, des premiers éléments (ai) adaptés pour résister à des efforts tranchants et des seconds éléments (i ) adaptés pour absorber des efforts normaux,…
The device (1) has a connection unit connecting a working platform (5) to a carrying structure (3), provided to allow displacement of the working platform with respect to the carrying structure along a transverse direction and a vertical direction. A manipulator arm (9) is…
Method for increasing the length of a span of a bridge formed by a deck (1) supported by abutments (4) and piers (2, 3), by removing at least one pier (2). According to this method, the following operations are carried out: a) construction of a tower (10) having an upper part…
The frame for a mixed ferro-concrete building beam (A) has alternating panels (alpha I) and pillars (Beta I). The panels resist shear loads and the pillars resist normal loads. The pillars and panels are connected together. The pillars can be adapted to transmit shear loads to…
1. A process for renovating roadways generally comprising a foundation layer, a base course and a pavement, according to which the old roadway is regenerated by a treatment which comprises removal of the existing roadway, collection and screening of the material removed, and…
Method for increasing the length of a span of a bridge formed by a deck (1) supported by abutments (4) and piers (2, 3), by removing at least one pier (2). According to this method, the following operations are carried out: a) construction of a tower (10) having an upper part…
The bridge central span has a rigid roadway (1) resting on end supports and on two piles. End spans are formed between a pile and an end support and the central span between two piles. At each end of the bridge is constructed a transverse beam (14,15) fixed to the roadway. The…
1. A process for renovating roadways generally comprising a foundation layer, a base course and a pavement, according to which the old roadway is regenerated by a treatment which comprises removal of the existing roadway, collection and screening of the material removed, and…
Method for increasing the length of a span of a bridge formed by a deck (1) supported by abutments (4) and piers (2, 3), by removing at least one pier (2). According to this method, the following operations are carried out: a) construction of a tower (10) having an upper part…
1. A process for renovating roadways generally comprising a foundation layer, a base course and a pavement, according to which the old roadway is regenerated by a treatment which comprises removal of the existing roadway, collection and screening of the material removed, and…
Method for increasing the length of a span of a bridge formed by a deck (1) supported by abutments (4) and piers (2, 3), by removing at least one pier (2). According to this method, the following operations are carried out: a) construction of a tower (10) having an upper part…