PURPOSE:To provide erection equipment for bridge girders which is relatively a small scale device and does not require support ropes and which can be traversed to the installation position of a bridge girder and also constructs a curved bridge having different girder lengths.…
Ps Kk
PURPOSE:To elimnate the previous execution of a temporary supporting pillar for feeding roller on the front bridge pier of a hand extension girder in a bridge girder layer device using a girder made of steel in which the girder made of steel is placed on a receiving board…
<P>PROBLEM TO BE SOLVED: To provide a structure and construction method for a bridge that can construct a bridge of satisfactory quality in a period shorter than the conventional one. <P>SOLUTION: The bridge comprises abutment units 1, pier units 2 and ribbed deck…
PROBLEM TO BE SOLVED: To provide a method which can produce a prestress-introduced precast concrete segment continuously in a short period in a narrow yard while facilitating the matching between the uneven parts of adjacent end faces. SOLUTION: With the use of a molded concrete…
PURPOSE: To confirm that a fluid filler is securely charged in a sheltered and hidden space. CONSTITUTION: When grouting 5 on a settled area of concrete-paved slab 1, electromagnetic wave sensors 11 are installed around cement-grouting holes 4 to pour cement from the holes 4.…
PURPOSE: To construct such a columnar hollow structure as being high in tenacity and excellent in earthquake-proofness in a short term of works. CONSTITUTION: A base bottom part segment 3 is locked on a concrete foundation by an anchor bolt 4, and hybrid prefabricated segments…
PURPOSE:To use a lightweight device to need no PC steel material and execute work handily and quickly by setting service trucks on Melan material after the Melan material is erected first and is supported with skew cables, and by manufacturing main girders in order.…
PURPOSE:To obtain side forms for manufacturing a precast block having mechanism suitable for a precast block manufacturing device by a method wherein side form supporting frames are supported on a base with tiltable quadric crank mechanism so as to be moved to the direction…
<P>PROBLEM TO BE SOLVED: To detect the filling degree of the grout material in a sheath pipe embedded in concrete by the measurment from the surface of concrete. <P>SOLUTION: An analyzer 11 is constituted so as to obtain the addition average wave G(t) of a plurality…
PROBLEM TO BE SOLVED: To dispense with special equipment or reinforcement for a traffic road below and construct bridge girders under a short time traffic control by employing relatively simple equipment when constructing bridge girders of an overhead bridge. SOLUTION: A trailer…
PROBLEM TO BE SOLVED: To reduce the number of high elevation work and contrive a common use or conversion of materials and members when constructing a column head of an overhanging erection girder bridge. SOLUTION: A section steel bent structure 10 is set up on the head 1 of a…
PROBLEM TO BE SOLVED: To eliminate reinforcements projecting to the upper surface of an installed girder and increase the labor-saving and safety factors, by providing a steel plate for embedding dowels flush with the upper surface of the upper flange of a precast concrete…
<P>PROBLEM TO BE SOLVED: To suppress deposit of scales and reduce the labor in maintenance works by eliminating necessity for the blowing operation. <P>SOLUTION: The humidifier is equipped with an evaporating water tank 13 to accommodate water, furnished with a…
PURPOSE: To eliminate the need for a scaffolding required for mounting and dismantling the forms of a cast-in-place floor slab section between precast concrete girders. CONSTITUTION: Forms 20 installed onto the undersides of the flanges 11 of girders 10 are inserted to the lower…
PURPOSE: To provide a pressure-resistant cylindrical pipe being used for a conduit or a water-conveyance tunnel or the like receiving high internal pressure and having a comparatively large bore. CONSTITUTION: A double steel shell 2 is formed in a segment shaped of an external…
PROBLEM TO BE SOLVED: To fasten a rod-shaped tensional material by uniform fastening force by providing a quenched wedge and a sleeve which are made of chrome molybdenum steel and have prescribed hardness, to a covering cylinder of a pure aluminium material. SOLUTION: In an FRP…
PROBLEM TO BE SOLVED: To increase the capacity, by interposing a composite material made of a specified fiber material and an epoxy resin between mutual ends of a simple beam oppositely arranged at the support point and connecting oppositely positioned cross beams to each other…
PROBLEM TO BE SOLVED: To easily perform execution and secure safety by integrally laminating a base material composed of an elastic foam body and a reinforcing film layer having a higher sliding property and higher strength than the base material fixed and formed on the surface…
PROBLEM TO BE SOLVED: To prevent the surface of a bridge pier with a circular section from breaking because of collision of boulder stones or the like, by attaching a deformed panel of a sectional shape having a swelled part with a smaller radius of curvature than a curved panel…
PROBLEM TO BE SOLVED: To perform transfer with adequate precision at a comparatively low cost without requiring any storage of a large quantity of iron blocks and any loading labor. SOLUTION: An electric chain block 4 to be tested is arranged between an upper loading beam 2 and…
PROBLEM TO BE SOLVED: To construct an overhanging bridge using corrugated steel plate webs, by attaching reinforcing steel members to the upper and lower edges of a corrugated steel plate and protruding it from an existing girder and partly bending the reinforcing steel member…
PROBLEM TO BE SOLVED: To construct a structure annexed around an existing structure comparatively simply by assembling the structure around the aerial exposed section of the existing structure and lowering and sinking the assembled structure into the ground or water along the…
<P>PROBLEM TO BE SOLVED: To provide a pier which eliminates a need for a sea-based scaffold or a support, enables quick construction, and has a stable quality without being affected by flux and reflux of tides even when part of the pier is immersed in the seawater, in…
PURPOSE: To provide a block manufacturing device of relatively simple construction which can ensure a necessary accuracy by providing a horizontal jack for laterally moving a horizontal restraining rail and a vertical jack for adjusting the height of a vertically supporting…
PURPOSE: To save labor, to improve quality and to reduce cost by curtailing the field works and assebly works of steel frames and reinforcements and minimally using froms in the constructing method of a structure. CONSTITUTION: Panels 1, 11, in which the cross sections of steel…