To provide a precast member for a floor slab capable of being efficiently constructed and having high quality in terms of durability or the like, and a construction method for a concrete structure using the same.SOLUTION: A precast member 8 for a floor slab is provided with a…
Ps Construction Co Ltd
To provide a method capable of preferably forming a desired partition wall in a void pipe of an existing hollow floor slab, and also to provide a method capable of fastening an anchor in a hollow part as expected.SOLUTION: A bag body insertion hole, an anchor insertion hole, and…
To provide a method capable of preferably forming a desired partition wall in a void pipe of an existing hollow floor slab, and also to provide a method capable of fastening and fixing an anchor at an expected fastening strength in a hollow part.SOLUTION: A bag body insertion…
To provide an underground water storage tank and a method for constructing the same, which can construct the underground water storage tank near a site boundary and can construct the underground water storage tank of a large storage capacity at low cost within a shorter…
To provide a bridge and its construction method capable of reducing a burden on a lower structure such as a bridge pier and shortening a construction period.SOLUTION: A bridge 1 comprises a substructure transverse beam 4 supported on the upper parts of each lower structure 3a,…
To provide a precast prestressed concrete product capable of ensuring high initial strength and excellent workability even when the replacement rate of blast furnace slag fine powder is increased.SOLUTION: A precast prestressed concrete product comprises: water W; a binding…
To provide a method with which measurement of an amount of a gap in a sheath can be accurately performed with simpler equipment on site, and operation to fill grout into a gap part in the sheath can be efficiently performed while minimizing unnecessary consumption of a grout…
To provide a precast member management system and method which can greatly reduce a load required for alternating an error member, and are rich in traceability.SOLUTION: There is provided a method for managing a member using a database in which an identification code of a…
To provide a connector that can be easily installed for an existing PC steel material.SOLUTION: There is provided a connector used to connect a first PC steel material and a second PC steel material, and the connector comprises a female member which has a first fixture insertion…
To provide technology that reduces the shaking of steps even in stands having steps with small rises or long span.SOLUTION: A stand 13 provided with a step floor 15 configured from multiple precast members 21 has step floors 15 with different gradient, and a method for designing…
To provide a bearing mounting member and a bearing replacing method which can be manufactured simply and inexpensively, and which can minimize labor in mounting to a concrete girder and burden on the concrete girder.SOLUTION: A bearing mounting structure 2 for connecting a…
To provide a construction method of a cast-in-place concrete pile allowing good quality concrete to be constructed by making the concrete flow outside of a steel cage through gaps between steel bars of the steel cage so as to reach a cover part.SOLUTION: A construction method of…
PROBLEM TO BE SOLVED: To accommodate piles that are subject to tensile forces, and reduce the amount of work required for construction by dividing a footing structure into upper and lower precast members, and making transportation and lifting easier. SOLUTION: In this…
PROBLEM TO BE SOLVED: To reduce the width dimension of a beam member by allowing a main beam reinforcement to protrude from the beam member only on one side. SOLUTION: The present invention comprises two PCa columns, two PCa girder beams placed on the two PCa columns, each…