Saturated sand or silt is densified at depth by applying a radially propagated lateral translation force within a region of the soil, while water is actively withdrawn from such region toward the point of application of such force. A densification device incorporating the…
Phoenix Engineering Ltd
A saturated particulate mass is densified by applying a compacting force by means of a vibrating probe (10) within a region of the mass, while actively withdrawing water from the region toward the source of application of the force.
A method of constructing an underwater fill in a manner which enables the formation of a dense fill pile having steep side slopes and having an improved capability to resist erosion. The method comprises withdrawing water from fill deposited at an underwater construction site as…
A method of constructing an underwater fill in a manner which enables the formation of a dense fill pile having steep side slopes and having an improved capability to resist erosion. The method comprises withdrawing water from fill deposited at an underwater construction site as…
Saturated sand or silt is densified at depth by applying a radially propagated lateral translation force within a region of the soil, while water is actively withdrawn from such region toward the point of application of such force. A densification device incorporating the…
METHOD AND APPARATUS FOR CONSTRUCTING AN UNDERWATER FILL ABSTRACT A method of constructing an underwater fill in a manner which enables the formation of a dense fill pile having steep side slopes and having an improved capability to resist erosion. The method comprises…
A saturated particulate mass is densified by applying a compacting force within a region of the mass, while actively withdrawing water from the region toward the source of applica-tion of the force.
A method of constructing an underwater fill in a manner which enables the formation of a dense fill pile having steep side slopes and having an improved capability to resist ero sion. The method comprises withdrawing water from fill de posited at an underwater construction…
A saturated particulate mass is densified by applying a compacting force by means of a vibrating probe (10) within a region of the mass, while actively withdrawing water from the region toward the source of applica tion of the force.