An incline correction method by weighted impending flat follows the steps as: 1. build an impending flat on a frame vertical pile to the back of an inclining building, and load weight on the flat; 2. before unloading weight, attach earth anchor to the impending flat; 3. after…
Assignee / Organization
Peiling He
11Total Forward Citations
2Indexed Patents
6Avg Citations / Patent
2Portfolio H-Index
A cleaning and reinforcing method of multi-adsorption and multi-dimension compacting for dump ground includes the steps as: 1)drive a cone shaped pile together with a cone shaped pipe through the dump layer to the soft earth; 2)fill in spongy stuffs of strong adsorption and…