In a method and equipment for continuous sintering of pelletized mineral material, a partition wall ( 7, 8 ) arranged between two adjacent cooling chambers ( 4, 5; 5, 6 ) is in the height direction placed at a distance from the pellet bed ( 2 ), so that in between the partition…
Palander Marko
The invention relates to an equipment to prepare ore concentrate for pelletizing and sintering/indurating of pellets in ferroalloys production. The equipment comprises a grinder (1) arranged to grind the concentrate to a predetermined grain size. The equipment further comprises…
In a method and equipment for continuous sintering of pelletized mineral material, a partition wall ( 7, 8 ) arranged between two adjacent cooling chambers ( 4, 5 ; 5, 6 ) is in the height direction placed at a distance from the pellet bed ( 2 ), so that in between the partition…
In a method and equipment for continuous sintering of pelletized mineral material, a partition wall (7, 8) arranged between two adjacent cooling chambers (4, 5; 5, 6) is in the height direction placed at a distance from the pellet bed (2), so that in between the partition wall…
The invention relates to an equipment to prepare ore concentrate for pelletizing and sintering/indurating of pellets in ferroalloys production. The equipment comprises a grinder ( 1 ) arranged to grind the concentrate to a predetermined grain size. The equipment further…