Patents
Assignee / Organization

Page Peter Ernest

128Total Forward Citations
4Indexed Patents
32Avg Citations / Patent
3Portfolio H-Index
US 2005028980 A1#289739 Most Cited · 91 citations4.3/yr · PR 10.23PendingUS · Application
Method of suspending, completing and working over a well

In the various methods of the present invention, reliance is placed on a first and second barrier 26 and 30 respectively positioned in a well 10 to provide well control during well suspension, completion and/or workover operations. Each of the barriers is below the depth of the…

US 2011192609 A1#3618304 Most Cited · 22 citations1.5/yr · PR 4.64PendingUS · Application
Retrievable Subsea Bridge Tree Assembly and Method

A retrievable bridge is provided which mounts to the top of a subsea tree to provide fluid communication between the production line of the subsea tree and a production flowline. The retrievable bridge mounts to the top of the subsea tree and preferably connects to a vertically…

US 8,672,038 B2#7848127 Most Cited · 13 citations1.1/yr · PR 1.70ActiveUS · Utility
Retrievable subsea bridge tree assembly and method
Inventors: Tan Hoon Kiang, Goi Kim Kok, Hyde Patrick Joseph, Page Peter ErnestAssignee: Tan Hoon Kiang, Goi Kim KokFiled 2011-01-28 · Granted 2014-03-18

A retrievable bridge is provided which mounts to the top of a subsea tree to provide fluid communication between the production line of the subsea tree and a production flowline. The retrievable bridge mounts to the top of the subsea tree and preferably connects to a vertically…

WO 2005/014971 A1#41549249 Most Cited · 2 citations0.1/yr · PR 0.98PendingWO · Application
A method of suspending, completing and working over a well

In the various methods of the present invention, reliance is placed on a first and second barrier (26) and (30) respectively positioned in a well (10) to provide well control during well suspension, completion and/or workover operations. Each of the barriers is below the depth…