In the various methods of the present invention, reliance is placed on a first and second barrier 26 and 30 respectively positioned in a well 10 to provide well control during well suspension, completion and/or workover operations. Each of the barriers is below the depth of the…
Page Peter Ernest
A retrievable bridge is provided which mounts to the top of a subsea tree to provide fluid communication between the production line of the subsea tree and a production flowline. The retrievable bridge mounts to the top of the subsea tree and preferably connects to a vertically…
A retrievable bridge is provided which mounts to the top of a subsea tree to provide fluid communication between the production line of the subsea tree and a production flowline. The retrievable bridge mounts to the top of the subsea tree and preferably connects to a vertically…
In the various methods of the present invention, reliance is placed on a first and second barrier (26) and (30) respectively positioned in a well (10) to provide well control during well suspension, completion and/or workover operations. Each of the barriers is below the depth…