Patents
Assignee / Organization

Olsen Tom

156Total Forward Citations
10Indexed Patents
16Avg Citations / Patent
3Portfolio H-Index
US 2004138944 A1#130105 Most Cited · 133 citations6.0/yr · PR 15.35PendingUS · Application
Program performance management system

A Program Performance Management (PPM) system enforces consistency in feedback and coaching to employees across the organization lower attrition through improved morale and job satisfaction. Employees are empowered because they can review their status and thus feel that they…

US 2009266548 A1#5136426 Most Cited · 17 citations1.0/yr · PR 5.16PendingUS · Application
Rock Stress Modification Technique
Inventors: Olsen Tom, Bratton Tom RAssignee: Olsen Tom, Bratton Tom RFiled 2009-04-07

A technique involves facilitating fracturing operations along a wellbore extending through a subterranean formation. A stress device is deployed in a wellbore and activated to engage a surrounding wall. The stress device can then be manipulated to create a reduced stress region…

WO 2007/147135 A2#17163813 Most Cited · 6 citations0.3/yr · PR 1.83PendingWO · Application
Method and system for designing and optimizing drilling and completion operations in hydrocarbon reservoirs

A method is disclosed for generating a wellsite design, comprising: designing a workflow for an Earth Model; building an initial Earth Model based on the workflow adapted for modeling drilling and completions operations in a hydrocarbon reservoir; calibrating the initial Earth…

WO 2007/147135 A3#73592274 Most Cited · 0 citations0.0/yr · PR 0.56ActiveWO · Utility
Method and system for designing and optimizing drilling and completion operations in hydrocarbon reservoirs

A method is disclosed for generating a wellsite design, comprising: designing a workflow for an Earth Model; building an initial Earth Model based on the workflow adapted for modeling drilling and completions operations in a hydrocarbon reservoir; calibrating the initial Earth…