PROBLEM TO BE SOLVED: To prevent noises and vibrations caused when a press machine is activated, facilitate assembling of the press machine, and realize compactness. SOLUTION: This assembling method comprises a step for mounting bearing parts 15 on both sides of an eccentric…
Ns Engineering Kk
PROBLEM TO BE SOLVED: To improve production tact of a press machine by cutting off an unnecessary slide motion within a limit of the number of revolution of a crankshaft. SOLUTION: A rotating field synchronous servo motor is used for a press driving servo motor 13, so that a…
PROBLEM TO BE SOLVED: To dispense with the temporary coffering in the aseismic reinforcement of a pier, to minimize the materials and cost for discharging earth and sand, and to shorten the term of works. SOLUTION: In the reinforcement of a pier column 3, a substantially…
PROBLEM TO BE SOLVED: To obtain a plate stock positioning device for a plate stock working machine having a small time constant of a control system at the time of transfer control of a work clamp. SOLUTION: In a plate stock positioning device 17 for a plate stock working…
PROBLEM TO BE SOLVED: To perform accurate folding by making a motor mechanism be connected to a ball screw part, and rotate the ball screw part through rotating force in accordance with the electric quantity of a driving signal, following the input of the driving signal, and…
PROBLEM TO BE SOLVED: To improve the speed of response, precision, noise reducing, efficiency and miniaturization of a uniaxial drive device. SOLUTION: A drive main body 3 is formed with a hollow 19 with openings 15 and 17 on both ends, in which hollow 19 a cylindrical rotor 21…
PROBLEM TO BE SOLVED: To surely and efficiently recover the water flow function of pavement surface layer materials. SOLUTION: Fine liquid masses and liquid drips are plunged into cavities by blowing the high pressure water jets discharged from a nozzle 6 against the surface of…
PROBLEM TO BE SOLVED: To firmly fix a reinforcing bar to the surface of existing concrete. SOLUTION: An anchor body 12 is inserted into a fitting hole 5, a nut member 13 is screwed to its head section, and an expansion member 17 is expanded to fix the anchor body 12. A spacer 22…
PROBLEM TO BE SOLVED: To chip concrete by water jet efficiently without unevenness and unchipped part left. SOLUTION: The apparatus chips the surface layer part of a concrete surface 2 by jetting high pressure water onto the surface 2 from a nozzle 8 by providing a rotary…
PROBLEM TO BE SOLVED: To provide a concrete crusher which is capable of efficiently crushing a wide variety of concrete and has enhanced reliability and durability and enables stabilization of the crushing operation and reduction in operating cost. SOLUTION: This concrete…
PROBLEM TO BE SOLVED: To provide a method and a device for cooling a nut for effectively and efficiently cooling a heat generating part and simultaneously improving lubrication. SOLUTION: When rotating a nut member 1 supported rotatably by a bearing 5 by a drive motor 9 to…
PROBLEM TO BE SOLVED: To enhance the strength of a concrete floor slab. SOLUTION: There is provided a concrete floor slab reinforcing apparatus which is comprised of longitudinal girders 6, and plate-like members 32. The longitudinal girders 6 are arranged between main girders…
<P>PROBLEM TO BE SOLVED: To provide a repairing equipment which can carry out a changeover between a partial repairing and an entire circumferential repairing in a short period of time, in a spray repairing for a molten metal container. <P>SOLUTION: The lining…
PROBLEM TO BE SOLVED: To provide an aseismatic reinforcing structure and an aseismatic reinforcing method for a wall type RC structure capable of attaining aseismatic reinforcement for the wall type RC structure easily, quickly and reliably by concurrently using a reinforcing…
PROBLEM TO BE SOLVED: To provide a repairing method and repairing hardware capable of preventing the drop of repairing materials when repairing a concrete structure. SOLUTION: This repairing hardware consists of an anchor 1 provided with a male screw in a base end part and a…
<P>PROBLEM TO BE SOLVED: To provide a fruit and vegetable sorter which can drastically reduce a manufacturing cost of a fruit sorting conveyor line for fruit and vegetables and can achieve the space saving in apparatus installation. <P>SOLUTION: A plurality of…
PROBLEM TO BE SOLVED: To provide an earthquake resistant reinforcing joint member, an earthquake resistant reinforcing device and an earthquake resistant reinforcing execution method capable of easily and efficiently manufacturing a joint member by rolling processing, excellent…
PROBLEM TO BE SOLVED: To reduce the electric rate and also, to downsize a power feeder by supplying power, according to the start and work situation of plural machine tools. SOLUTION: PHS telephones 3a, 3b,... are connected to the terminals 2a, 2b,... of benders 1a, 1b,... and a…
PROBLEM TO BE SOLVED: To prevent peeling of mortar from a concrete surface in a structure, in which titanium meshes are stuck on the surface of reinforced concrete by using mortar and reinforced concrete is electrically protected while using the titanium meshes as an electrode.…
PROBLEM TO BE SOLVED: To provide a bending load detection method, bending load detection device, bending method and bending machine for precise bending by a simple and low cost device. SOLUTION: When bending in cooperation of a punch and a die by elevating/ lowering a moving…
PROBLEM TO BE SOLVED: To provide a work post-executing anchor formed such that even when an anchor prepared hole formed in an RC structure pier is obliquely extended, an anchor can be given work execution vertical to a steel plate surface and concrete is prevented from being…
PROBLEM TO BE SOLVED: To connect a structural member by use of a bolt without using welding in a construction site. SOLUTION: This structural member is used by superposing and connecting the longitudinal edge 5 of a flat member 3 to the edge of a counter member, and it comprises…
PROBLEM TO BE SOLVED: To provide a portable multi-color indicator light suitable for traffic regulation for day and night use. SOLUTION: A plurality of lengthy rod-shaped rotation bodies 3, of which an outer surface is separated by at least two colors with a boundary in axial…
PROBLEM TO BE SOLVED: To prevent a clamper and a die from being broken, and to enable the punching with the minimum stroke by saving the clamper from a die arrangement area when the clamper enters the die arrangement area, moving a work to be positioned at the next punching…