A method for lifting and repairing a foundation is disclosed. The method includes digging a well in at least one lateral surface of the foundation, installing a shear plate to the at least one lateral surface of the foundation inside the opening of the well, further digging the…
Niroumand Kimiya
A method for lifting and repairing a foundation is disclosed. The method includes digging a well in at least one lateral surface of the foundation, installing a shear plate to the at least one lateral surface of the foundation inside the opening of the well, further digging the…
A cleaning device to remove debris from a mechanical auger. The cleaning device includes a strap and a strap furling mechanism. The strap is configured to be wrapped around the main shaft of the mechanical auger. The strap furling mechanism includes a rotating rod configured to…
A method for lifting and repairing a foundation is disclosed. The method includes digging a well in at least one lateral surface of the foundation, installing a shear plate below the at least one lateral surface of the foundation inside the opening of the well, further digging…
A barbed pile for soil reinforcement at a target location disclosed. The barbed pile may comprise an open-ended hollow pipe, a restriction plate, a plurality of perforations, and a plurality of wings. The open-ended hollow pipe may comprise an internal channel extending along a…