A group of arched precast concrete culverts are used for the construction of an aqueduct, a tunnel, a utility tunnel and other various closed conduits depending upon circumstances of the construction site. The culverts comprise a bottom portion (1), two leg portions (2, 2%)…
Nippon Zenith Pipe
PROBLEM TO BE SOLVED: To provide an impact-absorption technique capable of greatly improving damping effect of impulse energy, and stopping a material body having kinetic energy of 4000 KJ or more. SOLUTION: Elastic posts 20 eleastically deformable across the entire length are…
<P>PROBLEM TO BE SOLVED: To provide a guard fence 10 deformed little by snow pressure or the like even if installed in a heavy snowfall area, and constituted not to require much time and cost for repair work. <P>SOLUTION: This guard fence 10 is constituted by…
<P>PROBLEM TO BE SOLVED: To provide an aquatic vegetation constructing method preventing breakage of marine forest in typhoon weather, and efficiently restoring lost biogeocenosis: and to provide aquatic vegetation facilities. <P>SOLUTION: The aquatic vegetation…
PURPOSE:To improve the safety of occupants at the time of a collision by guiding a colliding vehicle back to a traffic lane. CONSTITUTION:A wall main body 2 made of precast concrete and having an expanded cross section downward is molded. Flat inclined faces 4 at a prescribed…
A mold is provided for use in the production of concrete pipe sections. The mold has an inner mold part including an arch-shaped mold member; a pair of substantially L-shaped side mold members each flexibly connected to an adjacent end of the arch-shaped mold member and…
<P>PROBLEM TO BE SOLVED: To provide a shock absorbing technique which can improve shock absorbing performance while restricting the cross section of a rope to a constant value. <P>SOLUTION: There is provided a shock absorbing fence, according to which protective…
<P>PROBLEM TO BE SOLVED: To provide a guard fence having the structure facilitating fitting and removal of a support post by allowing tilting and twisting of the support post in all directions with a simple structure. <P>SOLUTION: In the guard fence comprising the…
PROBLEM TO BE SOLVED: To improve workability, and to easily replace a column by placing the lower end of the column on an inclined face, and connecting and positioning anchors arranged on the inclined face and a lower part of the column by installing ropes. SOLUTION: Anchors 11,…
PROBLEM TO BE SOLVED: To provide a device and a method for absorbing a falling stone capable of reducing change of distance between a lower fringe of a facial absorbing body 1 and the ground surface and catching following falling stones accurately to absorb energy even if stones…
PROBLEM TO BE SOLVED: To provide shock absorbing technique capable of achieving high shock absorbing performance, and restricting overhang quantity sideways in receiving shock. SOLUTION: This device comprises columns 20 vertically provided at a specified interval from each…
<P>PROBLEM TO BE SOLVED: To provide a floating body for environmental measurement and an environmental measurement system capable of effectively performing the environmental measurement while specifying a measurement position. <P>SOLUTION: The controller of the…
PROBLEM TO BE SOLVED: To sufficiently exert impact absorbing performance of the whole fence by making a main loop and a net each independently and freely deformed without interfering with each other in reception of an impact.SOLUTION: A transverse frame 40 is inserted into a net…
PROBLEM TO BE SOLVED: To provide a buffer capable of providing high impact absorbing effect and reducing maintenance cost of an impact absorbing fence. SOLUTION: The buffer 1 includes a tube-shaped body 2; a female screw part 22 formed on a part of a housing chamber 21 formed…
PROBLEM TO BE SOLVED: To provide composite in-disaster sewage treatment facilities that functions as storage or outflow suppression facilities for rainwater and waste disposal facilities.SOLUTION: The in-disaster sewage treatment facilities include a water storage tank part…
PROBLEM TO BE SOLVED: To provide an anchor tension member and a construction method of an anchor capable of obtaining required strength by shortening the length of a borehole and a shorter anchor tension member. SOLUTION: The anchor tension member 1a includes an anchor length…
<P>PROBLEM TO BE SOLVED: To provide a bullet trapping device having improved transportability, handling property and assembling efficiency in spite of a large structure. <P>SOLUTION: The bullet trapping structure for trapping and collecting bullets shot from shooting…
PROBLEM TO BE SOLVED: To keep sand control function over a long period by standing a plurality of piles on the overflow port of a debris barrier to catch rocks having large diameters while allowing the passing of earth and sand and rocks having small diameters, and damping the…
<P>PROBLEM TO BE SOLVED: To provide a structure, a structure deterioration detecting system, and a structure deterioration detection method capable of efficiently detecting deterioration. <P>SOLUTION: IC tag embedded position data are stored in an IC tag embedded…
<P>PROBLEM TO BE SOLVED: To provide a vitreous solidifying material for acid-resistant hydraulic hardened body, which can reduce the equipment cost and raw material cost, a method for producing the same, an acid-resistant hydraulic hardened body, a method for producing the…
<P>PROBLEM TO BE SOLVED: To provide a concrete pipe body which has stable quality without being influenced by the environment in the construction field. <P>SOLUTION: The concrete pipe body has a joint portion which is formed at least at either one of opening edges on…
PROBLEM TO BE SOLVED: To provide an impact-absorbing technique capable of greatly improving damping effect of impulse energy, and stopping a material body having kinetic energy of 4000 KJ or more. SOLUTION: Elastic posts 20 elastically deformable over the entire length are…
PROBLEM TO BE SOLVED: To provide a hollow structure having a plurality of hollow portions capable of creating the structure at a low cost with a simple structure. SOLUTION: In this hollow structure 1; a cavity portion 6 directional to a longitudinal direction as same as that of…
<P>PROBLEM TO BE SOLVED: To provide a hollow structure which facilitates and ensures connection between a side wall member and an upper wall member thereof. <P>SOLUTION: The hollow structure is comprised of a connecting bent bolt 6 which passes through each member…
<P>PROBLEM TO BE SOLVED: To provide a method of construction of vegetation in water capable of efficiently restoring a lost ecosystem. <P>SOLUTION: This method of construction of vegetation in water comprises forming a water plant growing body 1 through vegetating…