PROBLEM TO BE SOLVED: To simply and surely restrain water leakage from a wall surface part of a specimen. SOLUTION: The lateral pressure P2 is set higher than the permeable pressure P1 by designated pressure, and a rubber sleeve 3a is pressed to the specimen 2 side by the water…
Nikken Kk
PROBLEM TO BE SOLVED: To provide a water permeability testing device for drainage pavement capable of performing an evaluation with higher reliability as compared with a conventional device by performing a water permeability test reproducing the road surface state of an actual…
PROBLEM TO BE SOLVED: To provide a load movement testing apparatus and method serving to make evaluations of high reliability by reproducing a situation of damage occurrence, corresponding to a variety of conditions and assuring high closeness and accuracy. SOLUTION: The method…
<P>PROBLEM TO BE SOLVED: To provide a vehicle cruise note testing machine which enables a similar noise measuring indoors without going out on a track, and has no influence in result of measuring by measuring location, environmental condition and velocity irregularity.…
PROBLEM TO BE SOLVED: To assemble a scaffolding on which a worker can get on to maintain, inspect and repair a wall surface of a bridge pier independently, slenderly and vertically erected so that it can elevate up and down and to hoist a heavy cargo by a winch. SOLUTION: It is…
<P>PROBLEM TO BE SOLVED: To provide a suspension device for vehicle capable of changing the range of the height allowing simple adjustment of the vehicle height to be made by the user. <P>SOLUTION: Between a spring receptacle 7 and a lower end piece 9b installed…
<P>PROBLEM TO BE SOLVED: To provide a decorated ceramic article improved in color development, and inkjet ink for the article. <P>SOLUTION: The decorated ceramic article includes a glaze layer having a pictural pattern glazed with red and/or yellow pigments formed on…
PROBLEM TO BE SOLVED: To effectively recover broken pieces or dust generated by concrete crushing work in building construction. SOLUTION: This dust collection instrument is constituted of a cup-shaped dust collection member 164 largely opened on one side thereof, the work ports…
PROBLEM TO BE SOLVED: To prevent the damage in an expansion arm having a plurality of stages expanded by combining them in a telescopic-shape. SOLUTION: A movement controlling mechanism of a deep digging excavator is equipped with an extension sensor 47 mounted to an expansion…
PURPOSE:To reduce the capacity at the time of no use by providing a scaffold board capable of vertically sliding and connecting plates capable of opening on a pair of struts, and providing a gear mechanism for vertically sliding the scaffold board and gears mutually engaged at…
PURPOSE:To provide a device for producing test sample capable of compacting an asphalt mixture while applying kneading and revolving motion thereto and making the angle of inclination of the kneading and revolving motion at the time of compaction variable and having a simple…
PROBLEM TO BE SOLVED: To cause high-precise coincidence of the movement distances of a push pull mechanism and a car body with each other and to facilitate accurate control of movement of a phase plate by a method wherein the operation distance of a hydraulic cylinder and the…
<P>PROBLEM TO BE SOLVED: To promote shifting from wakefulness to a relaxed state and further to a sleep state in a short time (about several minutes) by developing an apparatus to dissolve such sleeplessness for those suffering from insomnia based on scientific research in…
PROBLEM TO BE SOLVED: To provide an indoor-outdoor dual purpose load moving testing device capable of being conveyed to a measurement field by being equipped with only a necessary minimum mechanism and being miniaturized, and executing also an outdoor test by being equipped with…
<P>PROBLEM TO BE SOLVED: To quickly and properly evaluate separation resistance of an asphalt mixture in the asphalt mixture, by quickly reproducing a separation condition from an aggregate of asphalt generated by an action of water in the asphalt mixture, and by…
PROBLEM TO BE SOLVED: To improve sieving efficiency. SOLUTION: A base plate 6 is installed in a stand 5 in a manner that the pate 6 can swing. Consequently, since a sieve in the upper side of stacked sieves swings considerably and the sieves swing less as the sieves are in a…
<P>PROBLEM TO BE SOLVED: To provide a rainwater storing device capable of reducing maintenance work and achieving ease of use by ensuring rainwater in a rainwater tank 5 up to a predetermined water level when it rains and discharging precipitate 6 such as dust deposited on…
<P>PROBLEM TO BE SOLVED: To provide a pair of correcting underpants exerting effect of making the leg and belly look beautiful as well as excellent effect of making the buttocks look beautiful based on hip-raising function, thin and lightweight, easy to wear, giving less…
<P>PROBLEM TO BE SOLVED: To strip and eliminate an undesired material such as a road surface indicating paint (the so-called white line) executed on a paved surface of a road or the like and P-tiles executed on a building floor face, by a simple apparatus more efficiently…
PROBLEM TO BE SOLVED: To perform highly reliable evaluation by precisely reproducing the generation state of damage with high faithfulness corresponding to various conditions. SOLUTION: In a load moving test apparatus 1, a test piece 2 is also moved along a running direction…
<P>PROBLEM TO BE SOLVED: To provide an inorganic pigment improved in color developing property and an ink for inkjet using the same. <P>SOLUTION: The inorganic pigment, which is a compound oxide-based inorganic pigment having an average grain size of 500 nm or…
PROBLEM TO BE SOLVED: To solve problems such as the necessity of much labor, the complexity of work, the lowering of efficiency, the deterioration of form of an excavated hole, etc., when a circular hole is excavated with a deep-digging excavator. SOLUTION: A deep-digging…
PROBLEM TO BE SOLVED: To measure a content of cement or the like in a soil, by distributing and mixing hydrochloric acid to a storing means storing a fixed amount of soil and detecting a temperature rise of the soil due to the mixing. SOLUTION: A fixed amount of a soil S…
PROBLEM TO BE SOLVED: To provide a wheel tracking testing machine capable of measuring a plurality of sample substances continuously, and capable of increasing the working efficiency at the time of testing. SOLUTION: A sample 100b to be measured is automatically fed by an air…