Patents
Assignee / Organization

Nexant Inc

114Total Forward Citations
12Indexed Patents
10Avg Citations / Patent
4Portfolio H-Index
US 6,280,869 B1#534837 Most Cited · 67 citations2.7/yr · PR 9.43ExpiredUS · Utility
Fuel cell stack system and operating method
Inventors: Chen Tan-pingAssignee: Nexant IncFiled 1999-07-29 · Granted 2001-08-28

A fuel cell stack ( 6 ) includes at least first and second cells ( 40 ) and a separator assembly ( 42 ). Each cell includes an anode ( 44 ), a cathode ( 46 ) and electrolyte ( 48 ) between them. The separator assembly includes a fluid separator ( 58 ) having a fuel side, an…

US 6,274,258 B1#4607125 Most Cited · 19 citations0.8/yr · PR 2.80ExpiredUS · Utility
Fuel cell assembly
Inventors: Chen Tan-pingAssignee: Nexant IncFiled 1998-08-10 · Granted 2001-08-14

A fuel cell assembly ( 2 ) includes a vessel ( 4 ) containing a gas-permeable, porous housing ( 16 ). A fuel cell stack ( 14 ), including cells ( 42 ) and interconnect plates ( 44 ), is contained within the porous housing. Each interconnect plate has oxidant and fuel sides ( 64,…

CN 1,518,780 A#11577019 Most Cited · 9 citations0.4/yr · PR 2.14ExpiredCN · Utility
Fuel cell stack, fuel cell system and operation method thereof
Inventors: Tan-ping ChenAssignee: Nexant IncFiled 2001-06-14

A fuel cell stack includes at least first and second cells (40) and a separator (42). Each cell includes an anode (44), a cathode (46), and an electrolyte (48) between the anode and the cathode. The separator includes a fluid separator plate having a fuel region, an oxidant…

US 2018294649 A1#13116435 Most Cited · 8 citations1.0/yr · PR 2.02PendingUS · Application
Systems and methods for optimally delivering electrical energy in a network
Inventors: Bright Joseph M, Prais MauroAssignee: Nexant IncFiled 2018-04-05

A method for delivering an energy resource on a network includes receiving constraints, a first objective function, and a second objective function. The constraints represent electrical load capacities of elements of the network. The constraints and the first objective function…

CN 1,326,276 C#25217623 Most Cited · 4 citations0.2/yr · PR 1.33ExpiredCN · Utility
Fuel cell stack, fuel cell system and operation method thereof
Inventors: Tan-ping ChenAssignee: Nexant IncFiled 2001-06-14 · Granted 2007-07-11

A fuel cell stack includes at least first and second cells (40) and a separator (42). Each cell includes an anode (44), a cathode (46), and an electrolyte (48) between the anode and the cathode. The separator includes a fluid separator plate having a fuel region, an oxidant…

DE 20,122,157 U1#24391113 Most Cited · 4 citations0.2/yr · PR 1.43ExpiredDE · Utility
Fuel cell system has a series of stacked fuel cells through which natural gas is circulated
Inventors: Assignee: Nexant IncFiled 2001-06-14

The unit has a stack of fuel cell elements [6] with electrically conducting end plates [8,10]. The housing [4] has insulation [16] against the generated heat energy. Fuel in the form of natural or other gas is circulated through the fuel cell stack. Air also enters through…

WO 02,103,831 A1#28793368 Most Cited · 3 citations0.1/yr · PR 1.42PendingWO · Application
Fuel cell stack, system, and operating method
Inventors: Chen Tan-pingAssignee: Nexant IncFiled 2001-06-14

A fuel cell stack includes at least first and second cells (40) and a separator assembly (42). Each cell includes an anode (44), a cathode (46) and an electrolyte (48) between them. The separator assembly includes a fluid separator having a fuel side, an oxidant side, an anode…

CA 3,058,896 A1#116022449 Most Cited · 0 citations0.0/yr · PR 0.56PendingCA · Application
Systems and methods for optimally delivering electrical energy in a network
Inventors: Bright Joseph M, Prais MauroAssignee: Nexant IncFiled 2018-04-05

A method for delivering an energy resource on a network includes receiving constraints, a first objective function, and a second objective function. The constraints represent electrical load capacities of elements of the network. The constraints and the first objective function…

GB 2,578,005 A#107690840 Most Cited · 0 citations0.0/yr · PR 0.56ActiveGB · Utility
Systems and methods for optimally delivering electrical energy in a network
Inventors: Joseph M Bright, Mauro PraisAssignee: Nexant IncFiled 2018-04-05

A method for delivering an energy resource on a network includes receiving constraints, a first objective function, and a second objective function. The constraints represent electrical load capacities of elements of the network. The constraints and the first objective function…

US 10,770,901 B2#76544637 Most Cited · 0 citations0.0/yr · PR 0.56ActiveUS · Utility
Systems and methods for optimally delivering electrical energy in a network
Inventors: Bright Joseph M, Prais MauroAssignee: Nexant IncFiled 2018-04-05 · Granted 2020-09-08

A method for delivering an energy resource on a network includes receiving constraints, a first objective function, and a second objective function. The constraints represent electrical load capacities of elements of the network. The constraints and the first objective function…

WO 2018/187593 A1#114142062 Most Cited · 0 citations0.0/yr · PR 0.56PendingWO · Application
Systems and methods for optimally delivering electrical energy in a network
Inventors: Bright Joseph M, Prais MauroAssignee: Nexant IncFiled 2018-04-05

A method for delivering an energy resource on a network includes receiving constraints, a first objective function, and a second objective function. The constraints represent electrical load capacities of elements of the network. The constraints and the first objective function…