<P>PROBLEM TO BE SOLVED: To provide an outer form structure capable of releasing an outer form from a concrete structure, movable, having excellent ease of work, and capable of suppressing the rise of cost. <P>SOLUTION: This outer form structure 1 molds the…
Mk Engineering Kk
PROBLEM TO BE SOLVED: To solve a problem of a burr which is generated by infiltration of concrete into a gap formed at a joint between forms when a tunnel centering is formed by using the forms of a conventional type, and to provide a tunnel form which can carry out lining of…
<P>PROBLEM TO BE SOLVED: To provide an inner form structure enabling the easy assembly and disassembly of a scaffold. <P>SOLUTION: This inner form structure 1 is disposed on the inside of an outer form 100 and used for manufacturing a concrete structure in the…
<P>PROBLEM TO BE SOLVED: To provide a soundproof wall easily movable in moving the field with the progress of work. <P>SOLUTION: The soundproof wall is constructed to block an entrance of a tunnel 2 to absorb internal noise by a soundproof material 3, wherein the…
<P>PROBLEM TO BE SOLVED: To provide an apparatus for removing blood from a fish, enabling efficient and accurate removal of blood from a fish independently from the size of the fish. <P>SOLUTION: The apparatus is provided with an outer frame, a processing box…